Laserfiche WebLink
MITIGATION MONITORING PROGRAM FOR QUARRY EXCAVATION NO. QX-00-1 <br /> IMPACT MITIGATION MONITORING RESPONSIBILITY TIMING <br /> ACTION <br /> Disturbance to Pre-construction survey Written verification San Joaquin County Prior to approval <br /> possible nesting for nesting Swainson's is required from a Community of the <br /> sites for hawks within 0.25 miles of qualified biological Development Improvement <br /> Swainson's the project site boundaries consulting firm. Department, Public Plans, and during <br /> Hawk shall be conducted prior to Works, and the annual quarry <br /> construction if California State inspections. <br /> construction is scheduled Department of Fish <br /> to occur between March 1 and Game. <br /> through September 15. In <br /> the event that nesting <br /> Swainson's hawks are <br /> located, take avoidance <br /> measures should be <br /> undertaken as described <br /> in CDFG's Staff Report <br /> regarding Mitigation for <br /> Impacts to Swainson's <br /> Hawks(CDFG, 1995). <br /> Disturbance of Pre-construction surveys Written verification San Joaquin County Prior to approval <br /> possible nesting for burrowing owls within is required from a Community of the <br /> sites for 250 feet of the project qualified biological Development Improvement <br /> Burrowing Owls. boundaries shall be consulting firm. W partmedt Public Plans. <br /> conducted prior to <br /> he <br /> construction if California State <br /> construction is scheduled Department of Fish <br /> to occur between and Game. <br /> February 1 and August <br /> 31. In the event that <br /> active burrowing owl <br /> burrows are located, take <br /> avoidance measures <br /> should be undertaken as <br /> described in CDFG's Staff <br /> Report on Burrowing Owl <br /> Mitigation (DCFG, 1994). <br /> -7 - QX-00-1 <br /> Conditions of Approval <br />