Laserfiche WebLink
DEPARTMENT OF CONSERVATION <br /> FFZ, <br /> March 7, 2001 <br /> STATE OF CALIFORNIA <br /> r.rnC1\/liD <br /> MAR 14 2001 <br /> Community Development Dept. <br /> Chandler Martin <br /> OFFICE OF MINE <br /> RECLAMATION San Joaquin County <br /> Community Development Department <br /> Development Services Division <br /> sol K STREET 1810 East Hazelton Avenue <br /> SACRAMENTO <br /> C A L I F O R N I A Stockton, CA 95205 <br /> 95814 <br /> P H O N E Dear Mr. Martin- <br /> 916/323-9198 <br /> FAX Landmark Lathrop Group Quarry Excavation QX-00-1 <br /> 916/322-4862 Reclamation Plan <br /> INTERNET <br /> consrv.ca.gov The Department of Conservation's Office of Mine Reclamation (OMR) has <br /> reviewed the reclamation plan for San Joaquin County, application <br /> number QX-00-1. The proposed project will excavate 60 acres of a 162- <br /> G <br /> :R:YMDAVIS ER acre parcel over three years. The project is located on the southeast <br /> i <br /> G 0 V E R N O R quarter of the intersection of Interstate 5 and State Route 120, south of <br /> Lathrop. <br /> The Surface Mining and Reclamation Act of 1975 (SMARA) (Public <br /> Resources Code Section 2710 et seq.) and the State Mining and Geology <br /> Board regulations for surface mining and reclamation practice (California <br /> Code of Regulations (CCR) Title 14, Chapter 8, Article 1, Section 3500 et <br /> seq., Article 9 Section 3700 et seq.) require that specific items be <br /> addressed or included in reclamation plans. The following items were not <br /> adequately addressed in the document submitted, and we recommend <br /> that the reclamation plan be amended to fully address these items. <br /> Resoiling and Revegetation <br /> (Refer to SMARA Section 2773(a), CCR Sections 3503(a)(1),(f),(g), <br /> 3704(c), 3705(a),(b),(c),(d),(e),(f),(g),(h),(i),(j),(k),(I),(m), <br /> 3707(b),(d), 3711(a),(b),(c),(d),(e)) <br /> 1. CCR Section 3711(d) requires that topsoil stockpiles be protected from <br /> wind and water erosion. We commend the operator for stockpiling the <br /> topsoil. The reclamation plan must state the manner in which the <br /> topsoil will be protected from erosion. The application of an erosion <br /> r' <br />