Laserfiche WebLink
O�!N <br /> �P COUNTY OF SAN JOAQUIN <br /> Q THOMAS R. FLINN <br /> DEPARTMENT OF PUBLIC WORKS <br /> DEPUTY DIRECTOR <br /> • c.. v P.O. BOX 1810-1810 E. HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201-3000 THOMAS M.GAU <br /> MANUEL LOPEZ (209)FAX(209))468-2999 DEPUTY DIRECTOR <br /> 68-2999 29 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> February 14, 2001 <br /> MEMORANDUM _ <br /> 2001 <br /> TO: Kerry Sullivan, Deputy Director <br /> CONTACCommunity T PERSON ment Cha dlertMartin ment t,nmmunity Deti'e�oPment Depi. <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: QX-00-01 QUARRY EXCAVATION APPLICATION TO EXCAVATE 60 ACRES <br /> OF A 162-ACRE PARCEL, LOCATED ON THE SOUTHEAST QUARTER OF <br /> THE INTERSECTION OF INTERSTATE 5 AND STATE HIGHWAY ROUTE 120. <br /> (DISTRICT 5). <br /> APPLICANT: Landmark Lathrop Group LLC APN: 241-030-03 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Madruga Road has an existing right-of-way width of 50 feet and a planned right-of-way width <br /> of 50 feet. <br /> RECOMMENDATIONS: <br /> QX-00-01 <br /> 1. The excavation plan shall be prepared by a Registered Civil Engineer or Land Surveyor to <br /> include the following: <br /> a. The first 100 feet from Madruga Road shall be paved. <br /> b. A plan for the haul route using County roads shall be submitted to Public Works prior <br /> to release of building permit. <br /> C. No excavation or stockpiling of material shall be allowed within 25 feet of the <br /> property boundary, or the County right-of-way. <br /> 2. All private roads within the quarry shall be maintained as to control the dust. <br /> 3. A video tape of the planned haul route showing conditions of all County roads shall be <br /> made. The condition of San Joaquin County maintained roads along the haul route shall <br /> be reviewed with the Department of Public Works prior to the start of excavation. <br /> (Development Title 9-1415.2) <br /> 4. Loads on all public roads shall be restricted to legal loads only. <br /> (Street and Highway Title Section 10-2350) <br />