Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS TO DEVELOPMENT <br /> QX-00-01 <br /> 5. An encroachment permit shall be required for work within Madruga Road right-of-way. <br /> (Development Title 9-1145.4) <br /> 6. A cash deposit or security, adjusted every five (5) years, in an amount and form <br /> acceptable to the Department of Public Works shall be made to Public Works, said <br /> deposit shall guarantee that if the Permittee fails, refuses or neglects to repair roads <br /> along the haul route which may result from the permittee's operation, the Department of <br /> Public Works may do any work necessary to restore County roads along the haul route to <br /> equal or better than, original condition, using the funds from said cash deposit or security. <br /> (Development title 9-854.3) <br /> 7. A Maintenance Agreement to ensure that County roads along haul routes are maintained <br /> to a condition acceptable to San Joaquin County shall be executed by the applicant. The <br /> Maintenance Agreement shall be renewed every five (5) years. <br /> 8. A Traffic Impact Mitigation Fee will be required for this development. The Fee is due and <br /> payable at the time of excavation plan approval. The Fee currently is $170.83 per trip-end <br /> in the Manteca area. The Fee will automatically be adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as Published by the Engineering News Record. The <br /> number of trip-ends may be determined by a proportion to the length in time of quarry <br /> operation. <br /> 9. A traffic study shall be prepared, prior to public hearing, to determine the impacts and <br /> mitigation measures of the following intersections: <br /> • Madruga Road and Guthmiller Road <br /> • Guthmiller Road and State Highway Route 120 <br /> • Guthmiller Road and Yosemite Avenue <br /> • Project access and Madruga Road <br /> The developer shall deposit funds with the County for all costs, as estimated by the <br /> Department of Public Works Public Facilities Division, prior to Department of Public <br /> Works preparing or contracting for the required study. Any mitigations required by the <br /> traffic study shall be provided by the applicant. (Development Title Section 9-1150.4) <br /> 10. The entrance from Madruga Road to the edge of right-of-way shall be engineered using <br /> estimated truck trips to calculate "TI" and design the corresponding structural roadway <br /> section. <br /> GK:BN:mr <br /> PS-1 B05"7 B <br /> E: Tom Gau, Deputy Director/Development <br />