Laserfiche WebLink
C. The slope of a parking space shall not exceed 1/4 inch per foot(C.C.R.,Title 24). <br /> D. Provide one van parking space. <br /> f. UNIFORM FIRE CODE:The following Uniform Fire Code and San Joaquin County Ordinance Code <br /> requirements will be applicable and shall be incorporated in the construction plans before submittal <br /> to the Community Development Department for a building permit: <br /> (1) Fire flow and hydrants will be provided for the proposed project by the use of public water mains <br /> (Appendix III-A of the Uniform Fire Code). <br /> (2) Fire sprinkler systems shall be installed according to Article 10 of the California Fire Code and <br /> the appropriate standards and guides adopted in Chapter 35 of the California Building Code and <br /> the California Electrical Code. <br /> (3) Fire hydrants shall be supplied in accordancewith Appendix III-B of the Uniform Fire Code. <br /> (4) Fire department access roads shall be in accordance with Section 902.4 of the California Fire <br /> Code and the standards adopted by the San Joaquin County Fire Chiefs Association. <br /> (5) Key boxes: A knox box shall be installed according to the fire department's instructions. <br /> (6) Fire extinguishers shall be installed in accordance with California Fire Code,Volume 2, Standard <br /> 10-1. <br /> (7) Fire permits may be required prior to occupancy to conduct operations hazardous to life or <br /> property. (C.F.C.Section 105.2.1) <br /> 2. PUBLIC WORKS DEPARTMENT(Staff Contact: Gabe Karam, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a 42- <br /> foot-wide right-of-way from the centerline of Bird Road to the property across the parcel's <br /> frontage. A$280.00 fee currently is required for processing, per Development Title Table 9- <br /> 240.2, in addition to a copy of the Grant Deed. (Development Title Section 9-1150.5) <br /> d. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $657.00 per 1,000 gross <br /> square feet of building designated as Manufacturing in the Tracy area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the <br /> I isNews sebe allowed <br /> be verified that <br /> e <br /> existing development on this was n operation on or after Apri23, 1990n(ResolutoR-96- <br /> 592) <br /> e. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> U P-01-2\Hal l <br /> San Joaquin County Page 6 <br /> Community Development <br />