Laserfiche WebLink
s A4ulk <br /> COUNTY OF SAN JOAQUIN <br /> Q :a THOMAS R. FUNN <br /> 'A: < DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> =. P.O.BOX 1810-1810 E.HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> c�CfKop��P (209)465-3000 STEVEN WINKLER <br /> FAX(209)465-2999 DEPUTY DIRECTOR <br /> HENRY M. H[RATA <br /> DIRECTOR <br /> I <br /> I <br /> October 3 , 1996 , <br /> M E M Q R A N D M f� <br /> TO : Thomas M. Gau, Senior Civil Engineer >w OCT - 4 1996 <br /> Community Development Department <br /> COMMfJNP Y UtVtWeN,Ejq'i DEp-l. i <br /> CONTACT PERSON: Chandler Martin PLANNING D!V!�iON <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer 7 <br /> Public Services Division ` <br /> II <br /> i SUBJECT: MS-96-23 MINOR SUBDIVISION APPLICATION TO CREATE 12 LOTS 1 <br /> WITH A VESTING TENTATIVE MAP (LOTS 1-6 TOTAL 80 ACRES AND <br /> ARE TO BE LIMITED INDUSTRIAL, LOTS 7-12 TOTAL 6 . 2 ACRES <br /> AND ARE TO BE FREEWAY SERVICE) LOCATED ON THE WEST SIDE OF <br /> PATTERSON PASS ROAD AT THE WESTERN TERMINUS OF SCHULTE <br /> ROAD. (DISTRICT 5) . <br /> APPLICANT : King and Lyons APN: 209-090-31 <br /> k <br /> h <br />'I INFORMATION: <br /> r <br /> The site is not currently located within a Federal. Flood Insurance <br /> Administration Designated Flood Hazard Area . <br /> j <br /> Patterson Pass Road has a variable existing right-of-way ri ht-of-wa width and a <br /> variable planned right-of-way width. 1 <br /> I <br /> The Traffic Impact Mitigation Fee will be required when parcels are i <br /> developed. The fee is due and payable at the time of building permit <br /> application. <br /> RECOMMENDATIONS : <br /> k <br /> 1 . Either the Tentative Map shall conform to the adopted Special <br /> Purpose Plan or the Special Purpose Plan shall be revised to F <br /> reflect deviations in Storm Drainage Facilities and on-site <br /> Traffic Circulation. <br /> i <br /> 2 . A Parcel Map is required (Development Title Section 9-915 . 2) <br /> I <br />