My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000646
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25501
>
2600 - Land Use Program
>
MS-96-23
>
SU0000646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:27:52 AM
Creation date
9/8/2019 12:39:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0000646
PE
2622
FACILITY_NAME
MS-96-23
STREET_NUMBER
25501
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
ENTERED_DATE
9/24/2001 12:00:00 AM
SITE_LOCATION
25501 S PATTERSON PASS RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PATTERSON PASS\25501\MS-96-23\SU0000646\APPL.PDF \MIGRATIONS\P\PATTERSON PASS\25501\MS-96-23\SU0000646\CDD OK.PDF \MIGRATIONS\P\PATTERSON PASS\25501\MS-96-23\SU0000646\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> MS-96-23 <br /> 3 . All improvements shall be in conformance with the Improvement <br /> Standards and Specifications of the County of San Joaquin. All <br /> improvement plans and specifications shall include grading plan <br /> for each individual lot, if applicable . These improvement plans <br /> and specifications are subject to plan check, field inspection <br /> fees and must be approved by the County of San Joaquin Department <br /> of Public Works prior to approval of the Parcel Map. <br /> (Development Title Section 9-910 . 2) <br /> 4 . If improvements referred to herein are not completed prior to the <br /> approval of the Parcel Map, the subdivider shall execute an <br /> agreement with the County of San Joaquin ensuring the completion <br /> of improvements within one (1) year after filing the Parcel Map . <br /> (Development Title Section 9-1100 .3) <br /> 5 . Road "A" shall be named, dedicated and improved to County <br /> Standards for an 84 and 100-foot right-of-way industrial street <br /> and Roads "B" and "C'" shall be named, dedicated and improved to <br /> County Standards for an 84-foot right-of-way industrial street . <br /> (Development Title Sections 9-857 .4, 9-1150 . 2 and 9-1150 . 5) . <br /> 6 . Dedication to result in a 62-foot wide right-of-way from the <br /> ultimate centerline of Patterson Pass Road to the property line <br /> shall be required and improved on the subdivided side to County <br /> Standards and conform to the existing structural section. <br /> (Development Title Section 9-1150 . 5 (b) ) <br /> 7 . A community detention pond/terminal drainage system shall be <br /> provided to meet the requirements of the County and to provide <br /> adequate drainage for the subdivision. Hydrologic and hydraulic <br /> analyses shall demonstrate that all property, both downstream and <br /> upstream of the discharge, will not be subject to a higher flood <br /> level as a result of the proposed drainage . <br /> (Development Title Section 9-1135 . 2) <br /> 8 . The project shall be served by a public water system conforming <br /> to the requirements of the San Joaquin County Public Health <br /> Services Environmental Services Division, the Department of <br /> Public Works and the City of Tracy. The system shall provide <br /> adequate domestic and fire water supply in conformance to the <br /> requirements of the County Fire Warden and the local Fire <br /> District . <br /> (Development Title Section 9-1120 . 2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.