Laserfiche WebLink
... %s/ <br /> Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA02-618 <br /> 4. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910.20) <br /> 5. Requirements for construction of improvements shall be noticed by a statement on the <br /> Parcel Map. <br /> (Subdivision Map Act Section 66411.1) <br /> 6. Drainage from each Parcel shall be retained on-site by a retention basin(18-inch <br /> maximum depth) and shall be noticed by a statement on the Parcel Map. Drainage for <br /> each parcel shall be calculated prior to release of Building Permit. <br /> (Development Title Section 9-1135.9) <br /> 7. This area has been subject to historic flooding. Therefore, prior to recording the Final <br /> Map, either a flood study shall be conducted and submitted to the San Joaquin County <br /> Department of Public Works for review which defines the limits of flooding and the <br /> 100-year flood elevations for Gill Creek, or a note shall be added to the Final Map which <br /> specifies that all structures constructed on parcel 1, 2, 3, and 4 shall be elevated 2-feet <br /> above the highest grade adjacent to the structure. <br /> 8. Work within Gill Creed banks will require an encroachment permit from the San Joaquin <br /> County Flood Control Division. <br /> BN:ar <br /> P TOMMEYTSWSWr 20021PA-02-618.wpd <br />