Laserfiche WebLink
6 . Replacement of Topsoil . During the excavation , the topsoil <br /> shall be set aside . Upon completion of an excavation , the <br /> topsoil shall be replaced , and the site leveled in <br /> conformance with the Grading Excavation Permit . <br /> 7 . Weed Control . Operations shall be in accordance with <br /> instructions from the Agricultural Commissioner to control <br /> the spread of noxious weeds . <br /> 8 . Health Considerations . The excavation shall not cause <br /> health or sanitary hazards and shall not create conditions <br /> which will cause the breeding or increase of mosquitoes , <br /> rodents or other pests . <br /> 9 . Commencement of Work. A written notification of the work <br /> schedule shall be provided to the County by the applicant <br /> prior to any grading or excavation. <br /> 10 . Certification of Compliance . At the completion of each <br /> phase of the grading , the applicant shall have a Registered <br /> Civil Engineer or Licensed Land Surveyor compare the <br /> excavation' s final elevations with the approved permit . The <br /> Engineer or Surveyor shall submit a certified , written <br /> finding to the Planning Division which states and documents <br /> the compliance or non—compliance of the excavation with the <br /> approved permit , and also states and documents the <br /> compliance or non—compliance of the previous phases' <br /> rehabilitation. <br /> 11 . Performance Guarantee . To insure that the excavation is <br /> completed in conformance with the approved permit , the <br /> operator shall secure a performance bond or other financial <br /> security sufficient to cover the cost of rehabilitation of <br /> the site for agricultural use . The form of the bond or <br /> other financial security shall be found acceptable by County <br /> Counsel . <br /> 12 . Time Limitation. The excavation , rehabilitation , conditions <br /> of approval shall be completed by April 11 , 1998 . If the <br /> excavation does not commence within eighteen ( 18 ) months <br /> after April 11 , 1988 , the permit shall be null and void , <br /> except as to its rehabilitation requirements . <br />