Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> GX-88-1 <br /> MOFFATT AND HOBSON <br /> PLANNING DIVISION <br /> 1 . The required financial guarantee shall be submitted to the <br /> Planning Division prior to the commencement of excavation. <br /> The guarantee must remain in effect until released by <br /> written authorization from the Planning Division. <br /> 2 . The reports required for the certifications of compliance <br /> must be submitted to the Planning Division within thirty <br /> ( 30 ) days after excavation has been completed on each <br /> excavation phase , and shall include a similar certification <br /> of the previous phase's reclamation. For the last phase's <br /> reclamation , a separate certificate of compliance shall be <br /> submitted within 30 days of its completion. Specifically , <br /> the required reports shall be submitted in the following <br /> manner : <br /> First Report : Detailing the status of Phase 1 "North" <br /> excavation . <br /> Second Report : Detailing the status of Phase 1 "South" <br /> excavation , and Phase 1 "North" <br /> rehabilitation. <br /> Third Report : Detailing the status of Phase 2 <br /> excavation , and Phase 1 "South" <br /> rehabilitation . <br /> Fourth Report : Detailing the status of Phase 3 <br /> excavation , and Phase 2 rehabilitation. <br /> Fifth Report : Detailing the status of Phase 3 <br /> rehabilitation. <br /> 3 . Any soil that is to remain stock piled on—site for longer <br /> than one—year shall be vegetated with some type of perennial <br /> grass such as rye or red clover by October 15 . <br /> 4 . As part of the rehabilitation of each phase , the land shall <br /> be planted with agricultural crops , or some type of <br /> perennial grass such as rye or red clover . The details for <br /> the revegetation shall be included in the rehabilitation <br /> report required in #2 (above) . <br />