My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009384
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
2900
>
2600 - Land Use Program
>
PA-1200200
>
SU0009384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:00 AM
Creation date
9/8/2019 12:41:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009384
PE
2631
FACILITY_NAME
PA-1200200
STREET_NUMBER
2900
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01315031
ENTERED_DATE
10/29/2012 12:00:00 AM
SITE_LOCATION
2900 E PELTIER RD
RECEIVED_DATE
10/25/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PELTIER\2900\PA-1200200\SU0009384\APPL.PDF \MIGRATIONS\P\PELTIER\2900\PA-1200200\SU0009384\CDD OK.PDF \MIGRATIONS\P\PELTIER\2900\PA-1200200\SU0009384\EH COND.PDF \MIGRATIONS\P\PELTIER\2900\PA-1200200\SU0009384\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions <br /> Site Approval Application No. PA-1200200 was approved by the Planning Commission on . The <br /> effective date of approval is . This approval will expire on , which is 18 months from the effective <br /> date of approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been issued and remain in force, and (3) all necessary permits from other <br /> agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, 209-468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for a small winery to be built in three phases over a ten year <br /> period as shown on the Revised Site Plan dated December 7, 2012. (Use Type: Wineries and <br /> Wine Cellars—Winery, Small). Phase One, building permits to be issued within 18 months from the <br /> effective date of approval, includes the construction of a 9,550 square foot multipurpose winery <br /> building to include a wine tasting room; lab; office; case, tank and barrel storage and restrooms <br /> and an 800 square foot crush pad. Phase Two, building permits to be issued within five years <br /> from the effective date of approval, includes the construction of a 7,500 square foot production <br /> building. Phase Three, building permits to be issued within ten years from the effective date of <br /> approval, includes the construction of a 7,500 square foot production building. Thirty marketing <br /> events per year are also proposed with a maximum attendance of 150 people as shown on the <br /> proposed marketing plan dated October 17, 2012. <br /> c. MARKETING EVENTS: Marketing Events are subjected to the following regulations: <br /> 1) A maximum of thirty (30) marketing events are permitted annually as a part of the proposed <br /> marketing plan dated October 17, 2012. <br /> 2) Each event shall have a maximum attendance of 150 people. <br /> 3) Marketing Events shall end by 10:00 p.m. (Development Title Section 9-1075.5 (m)(2). <br /> 4) Amplified music shall not be permitted as part of this approval. <br /> d. PRODUCTION CAPACITY: A small winery shall have a minimum production capacity of 201 <br /> gallons of wine per year and a maximum production capacity of 36,000 gallons of wine per year. <br /> (Development Title Section 9-1075.51a]). <br /> San Joaquin County PA-1200200\M2 Winery <br /> Community Development Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.