Laserfiche WebLink
PUBLIC-HEALTH SERVICES <br /> SAN JOAQUIN COUNTY Yq. .coi <br /> r.� <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br /> 445 N. San Joaquin Street 0 P.O. Box 388 • Stockton, CA 95201-0388 �4cikoR�'�P <br /> (209) 468-3420 <br /> February 23, 1995 <br /> TO: San Joaquin County Community Develop me pepartment <br /> FROM: Public Health Services <br /> Environmental Health Division <br /> CONTACT PERSON: Ted Norgard, Senior REHS lU4w 71995 <br /> PHONE NUMBER: (209)468-3443 PLA <br /> "IN61)11 " ' `t"i <br /> RE: MS-95-8, Attention Chandler Martin <br /> 9122 East Peltier Road, Acampo <br /> The San Joaquin County Development Title Requirements listed below have been <br /> identified as pertinent to the project. Other Requirements may also apply. These <br /> Requirements cannot be modified. <br /> a. A soil suitability study, as required by Section 9-1 105.2(d) of the San Joaquin <br /> County Development Title, indicating that the area is suitable for a septic tank <br /> system must be performed prior to recordation of Parcel Map. A review fee of <br /> $156.00 is required at time of submittal to the Environmental Health Division. <br /> The sewage disposal system shall comply with the on site sewage <br /> standards of San Joaquin County prior to approval. A percolation test <br /> that meets absorption rates of the manual of septic tank practice or <br /> E.P.A. Design Manual for onsite wastewater treatment and disposal <br /> system is required for each parcel. A permit fee of $78.00 per <br /> percolation hole is required. <br /> b. The existing private water wells shall be tested for the chemical <br /> dibromochloropropane (DBCP) and nitrates prior to recordation of the Parcel <br /> Map. Samples are to be taken and analyzed by a State-approved laboratory. <br /> (San Joaquin County Development Title Section 9-1 1 1 5.7) <br /> C. Construction of individual sewage disposal system(s) under permit and <br /> inspection by the Environmental Health Division is required at the time of <br /> development (San Joaquin County Development Title Section 9-1110.3 & 9- <br /> 1 1 10.4). <br /> d. Construction of an individual domestic water well under permit and inspection <br /> by the Environmental Health Division is required at the time of development. <br /> (San Joaquin County Development Title Section 9-1115.3) <br /> A Di%ision of San Joaquin Count) Health Care Services <br />