Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> DV-95-2/MS-95-24 <br /> 2 . An Irrevocable Offer of Dedication to result in a 25-foot wide <br /> right-of-way from the centerline of Lubell Lane (Private Road) <br /> to the property line shall be required across the frontage of <br /> APNs 017-190-03 and 04 . <br /> (Development Title Section 9-1150 . 16 (b) (4) ) <br /> 3 . The frontage improvements for Lubell Lane shall be constructed in <br /> conformance with the standards for one-half of a 50-foot right-of-way <br /> Rural Residential Road. The construction of the frontage improvements <br /> will be deferred, upon execution by the owner of a Deferred Frontage <br /> and Roadway Improvement Agreement or a Secured Deferred Frontage and <br /> Roadway Improvement Agreement with a deposit equivalent to their <br /> estimated construction costs prior to approval of the Parcel Map . <br /> (A $260 . 00 fee currently is required for processing per Development <br /> Title Table 9-240 . 2 in addition to a copy of the Grant Deed, recording <br /> fee, legal descriptions of Parcels 2 and 3 and an estimate . The <br /> estimate and legal descriptions shall be prepared by a Registered <br /> Civil Engineer with a typical section drawing on a form to be supplied <br /> by the Department of Public Works and submitted to the Department <br /> of Public Works for approval . As an option, the Department of <br /> Public Works will prepare the drawing with estimate for an additional <br /> fee of $115 . 00 . ) <br /> (Development Title Section 9-1150 . 16 (b) (1) ) <br /> 4 . All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910 . 20) <br /> 5 . Any driveway that exceeds 150 feet in length from any public roadway <br /> shall be improved in accordance with the requirements of the Uniform <br /> Fire Code Section 10 . 207, San Joaquin County Standards F-la, F-lb and <br /> F-lc and the Liberty Fire District prior to issuance of the occupancy <br /> permit . <br /> (Development Title Section 9-1145 . 5) <br /> 6 . Requirements for construction of improvements shall be noticed by a <br /> statement on the Parcel Map. <br /> (Subdivision Map Act Section 66411 . 1) <br /> 7 . Drainage from each Parcel shall be retained on-site and shall be <br /> noticed by a statement on the Parcel Map. <br /> (Development Title Section 9-1135 . 9) <br /> RWH: lt <br /> PS-5E220.C4 <br /> E : Manuel Lopez, Deputy Director/Development <br />