My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003628
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POCK
>
3110
>
2600 - Land Use Program
>
PA-0300597
>
SU0003628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:06 AM
Creation date
9/8/2019 12:45:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003628
PE
2633
FACILITY_NAME
PA-0300597
STREET_NUMBER
3110
Direction
S
STREET_NAME
POCK
STREET_TYPE
LN
City
STOCKTON
APN
17912008
ENTERED_DATE
5/7/2004 12:00:00 AM
SITE_LOCATION
3110 S POCK LN
RECEIVED_DATE
5/4/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\POCK\3110\PA-0300597\SU0003628\APPL.PDF \MIGRATIONS\P\POCK\3110\PA-0300597\SU0003628\CDD OK.PDF \MIGRATIONS\P\POCK\3110\PA-0300597\SU0003628\EH COND.PDF \MIGRATIONS\P\POCK\3110\PA-0300597\SU0003628\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e . <br /> .o l <br /> 1lclly ouilivaii <br /> COMMUNITY DEVELOPMENT <br /> PA-03-597 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. ('the fee currently is $1306.00 per 1,000 gross square foot of <br /> building designated as Service Commercial in the Stockton area. The fee shall be automatically adjusted <br /> July I of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $569.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January <br /> 1 of each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. A State Reclamation Board Permit shall be required for all work done on Duck Creek. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> P\COMMENTS\SA\YR 2003\PA-0300597—pd <br />
The URL can be used to link to this page
Your browser does not support the video tag.