Laserfiche WebLink
e . <br /> .o l <br /> 1lclly ouilivaii <br /> COMMUNITY DEVELOPMENT <br /> PA-03-597 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. ('the fee currently is $1306.00 per 1,000 gross square foot of <br /> building designated as Service Commercial in the Stockton area. The fee shall be automatically adjusted <br /> July I of each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record.) (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $569.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January <br /> 1 of each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. A State Reclamation Board Permit shall be required for all work done on Duck Creek. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> P\COMMENTS\SA\YR 2003\PA-0300597—pd <br />