Laserfiche WebLink
Kerry Sullivan -3- <br /> COMMENTS ON DEVELOPMENTS <br /> UP-01-05 <br /> 9. A detention pond shall be provided to meet the requirements of the County and to provide <br /> adequate drainage for the development. <br /> (Development Title Section 9-1135.3) <br /> Traffic study is required due to the potential traffic to be gettetated fioni the proposed <br /> development. The traffic study shall be compfeted prior to the approval of this <br /> application. T-11c eonsulting Engineer shall teconuriend the scope of road Segments and <br /> intersect to be studied, eowity staff will detennine final scope of LIN- Th <br /> shall deposit funds with the Elounty for all costs, --,- CS"I'mated 1bu tile Depaltillerlt Of tfullic <br /> (Be-vejoplijent Title Section 9-1150.4) <br /> 10. The applicant shall pU fair-share of the improvement costs for installation of a traffic <br /> signal at the intersection of French Camp Road and Ponderosa Street. The fair-share <br /> amounts to $20,600.00 (10.3% of$200,000-00). for the installation of a future traffic <br /> signal (Traffic Study dated June 2002 by Omni-Means. <br /> GK:sh <br /> P\CON,IIdENTS\UP\Yr tool\UP-01-05(revision).wpd <br />