My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003192
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PRIEST
>
8858
>
2600 - Land Use Program
>
SA-92-25
>
SU0003192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:42 AM
Creation date
9/8/2019 12:46:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003192
PE
2633
FACILITY_NAME
SA-92-25
STREET_NUMBER
8858
Direction
S
STREET_NAME
PRIEST
STREET_TYPE
RD
City
FRENCH CAMP
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
8858 S PRIEST RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PRIEST\8858\SA-92-25\SU0003192\APPL.PDF \MIGRATIONS\P\PRIEST\8858\SA-92-25\SU0003192\CDD OK.PDF \MIGRATIONS\P\PRIEST\8858\SA-92-25\SU0003192\EH COND.PDF \MIGRATIONS\P\PRIEST\8858\SA-92-25\SU0003192\CORRESP.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS ON DEVELOPMENTS <br /> SA-92-25 <br /> 4 . The frontage improvement for Priest Road shall be constructed <br /> in conformance with the standards for one-half of a 50-foot <br /> right-of-way industrial street. The construction of the <br /> frontage improvements will be deferred upon execution by the <br /> owner of a Deferred Frontage and Roadway Improvement Agreement <br /> or a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated <br /> construction costs prior to approval of the Improvement Plan. <br /> (A $250. 00 fee currently is required for processing per <br /> Planning Title Section 9-10502 in addition to a copy of the <br /> Grant Deed and an estimate for the required frontage <br /> improvements. The estimate and legal description shall be <br /> prepared by a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Public Works Department <br /> and submitted to the Public Works Department for approval. As <br /> an option the Department of Public Works will prepare the <br /> drawing and estimate for an additional fee of $100 . 00. ) <br /> (Planning Title Section 9-2143) <br /> 5 . The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently <br /> is $88 . 89 per 1, 000 gross square foot of building as <br /> "Warehouse" or "Manufacturing" . If there is no building permit <br /> required, the fee will be exempt. The fee shall be <br /> automatically increased on January 1 of each year at the rate <br /> of 6 . 9 percent. An additional 3 . 5 percent shall be added to <br /> the fee upon payment for processing and administering the <br /> program. (Resolution R-91-327) <br /> 6 . A National Pollution Discharge Elimination System permit will <br /> be required. Discharge of processed water will not be allowed <br /> into the storm drain system. <br /> c: Manuel Lopez <br /> Deputy Director/Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.