Laserfiche WebLink
PpUIN <br /> T".- ­cl COUNTY OF SAN JOAQUIN <br /> EUGENE DELUCCHI <br /> DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P.O.BOX 1810- 1610 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> (209)468-3000 j <br /> MANUEL LOPEZ <br /> -g O Rd DEP1J.7 DIRECTOR <br /> HENRY M. HIRATA RICH 0 C."PAYNE <br /> DIRECTOR DERUrY 4RCCTOR <br /> April 8 , 1992 0, <br /> M E M 0 R A N D U M <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Richard Larrouy <br /> FROM: Charles Kelley, Senior Civil Engine <br /> Public services Division Ff� <br /> SUBJECT: SA-92-25 to add a liquid fertilizer storage and mixing <br /> facility to an existing dry fertilizer sales facility. Proposal <br /> includes six 30, 000 gallon storage tanks and 20, 000 gallon mixing <br /> tanks. Located on the S. side of Priest Rd. , at the Union Pacific <br /> Rail Road Tracks in French Camp. <br /> APPLICANT: Bill Mc Roy APN: 193-220-02 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Priest Road has an exist-ling right-of-way width of 30 feet, and a <br /> planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1 . Dedication to result in a 25-foot wide right-of-way from the <br /> centerline of Priest Road to the property line shall be <br /> required across the frontage of APN 193-220-02 . <br /> (Planning Title Section 9-2143) <br /> 2 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently are $1 , 365. 00 <br /> per 1, 000 gross square foot of building as "Warehouse" , <br /> $1, 075. 00 per 1, 000 gross square foot of building as <br /> "Manufacturing" , or $279 . 59 per daily trip-end generated in the <br /> Stockton area. If there is no building permit required, the <br /> fee will be exempt. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> 3 . Encroachment permit shall be required for work within road <br /> right-of-way. (Streets and Highway Title Section 10-3103) <br />