Laserfiche WebLink
1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jim Van Buren, 468- <br /> 2374) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT". The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the"SITE PLAN CHECK <br /> LIST'for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884)(Phasing: As required) <br /> b. APPROVED USE: This approval is to add restaurant services and theatrical <br /> performances in an existing live entertainment/dance bar, establish a ghost town <br /> outdoor historical walking amusement area, add an outdoor group functions area, <br /> add retail sales in various existing buildings, add guided tours, and allow semi- <br /> annual special events. <br /> 1) Phasing Approvals Schedule Two 2 By Osteher December 31, 2002-, <br /> Phasino Aooroval Srhedule Three (a) by December 31 2994. <br /> Phasing Aocroval Schedule Four (41 by uecemoer 31 2005 <br /> - <br /> Phasing Approval Schedule Five (5) by December si tuuo <br /> a New Restrooms, (under constructionl <br /> b 720 Sq. ft Children Saloon, Phase Two <br /> c 505 sq. ft J. J. Flash Building, Phase Three, <br /> d 125 Sq. ft Bank portion of J. J. Flash Building, Phase Three, <br /> e 127 Sq. ft General Store, Phase Four, <br /> f Gazebo Picnic Area. (in use) <br /> 2) Phasing ApPF0YRIA SGhedule Two (2) By_Aug4st3Q—, 2QQ_3.. <br /> a Palace Showboat, Phase Three, <br /> b 160 Sq. Ft Assay Office, Phase Four, <br /> c 382 Sq. Ft Gazette, Phase Four. <br /> 3) Phasing APPF9VAIR SGhPdi 119 ThFee (a) Ry Ii ine 30, 2004: <br /> a Gazebo Building, Phase Five, <br /> b General Store Addition, Phase Five, <br /> c J. J. Flash Building Addition, Phase Five, <br />