Laserfiche WebLink
I..00 In K L E I NFELDER <br /> the standard criteria of 150 gallons per residential unit per day, this corresponds to approximately <br /> 24 units on the 12.2-acre facility. <br /> In our evaluation of nitrate loading, we have used the Hantzsche mass balance equation (source: <br /> Predicting Ground-Water Nitrate-Nitrogen Impacts, Hantzsche and Finnemore (1992)), which is <br /> presented below with an explanation for each factor and the value used in our study. The <br /> selection of parameters was based on previous studies and investigations performed by our firm <br /> and others, San Joaquin County Sewage Standards, communications with Mr. Mike Huggins <br /> with the SJCPHS/EHD, and information provided in a report dated March 19, 1997 prepared by <br /> the Questa Engineering Corporation and authored by Mr. Hantzsche for a development in the <br /> Stockton area. <br /> N�=AWNw0-D)+IN- R <br /> AW+R <br /> Where: <br /> N, = Average calculated nitrate-nitrogen in groundwater resulting from domestic sources and precipitation <br /> —mg/l,as N <br /> A = Number of dwelling units per acre on septic tanks (unit/acre) = 2.0 (based on an estimated water <br /> usage of 3,586 gal./day divided by 150 gal./day to obtain an equivalent number of homes,divided by <br /> 12.2 acres) <br /> W = Annual wastewater loading per dwelling unit per acre (inches) = 2.0 inches (per year per dwelling <br /> unit assuming a flow of 150 gal./day/dwelling unit) <br /> Nw = Nitrate concentration of nitrified leachfield effluent (mg/1) = 5 mg/1 (measurement at spray bar was <br /> only.3 mg/l which means that waste stream contains very little restroom flow) <br /> D = Percent dentrification of leachfield effluent=0.35 percent(0.1 to 0.35 percent typical per Hantzsche <br /> and Finnemore([1992]Note that measured total N next to existing line was only .11 mg/I indicating <br /> that the near-surface clay soils were very effective in converting nitrate.) <br /> R = Annual deep percolation of precipitation (inches) = 10.8 inches (representing 80 percent of average <br /> annual rainfall of 13.5 inches in project area. Remaining 20 percent of rainfall is assumed to drain <br /> off-site into natural or manmade drainages) <br /> Nb = Background nitrate nitrogen concentration of rainfall recharge at the water table = 0.5 mg/1 (per <br /> Technical Memorandum, Hydrologic and Soil Investigation for the Chico Urban Area, page 6, <br /> Dames and Moore,April 1996) <br /> Our calculation is as follows: <br /> N� = 2(2)(5)(1 —.35)+.5(10.8) = 13 +5.4 = 1.2 mg/1 as N <br /> 2(2)+ 10.8 4+10.8 <br /> Typically, the value for Nw is assumed to be higher. Very seldom, however, is a septic tank <br /> opened and a water sample obtained for actual chemical testing. At Pollardville,the combination <br /> 20-0268-01/STO2R886 December 5,2002 <br /> ©2002 Kleinfelder,Inc. Page 4 of 5 <br />