Laserfiche WebLink
• "Make the retention pond two acres for a community baseball/soccer field/aquifer recharge basin": <br /> The Parks and Recreation Department has reviewed the project and required the collection of in-lieu <br /> fees for park development. They did not require a park or ball field on the proposed retention pond <br /> (Lot A). <br /> • "Adequate road for Morada Fire Department": As a Condition of Approval, the Public Works <br /> Department is requiring Ghana Road to be dedicated and improved to County Standards for a 50- <br /> foot-wide right-of-way rural residential street. <br /> San Joaquin County PA-0500401\Ghana <br /> �.. Community Development Page 4 <br />