Laserfiche WebLink
4. Construct a water well under permit and inspection of the <br /> Environmental Health Division prior to occupancy. Should the number <br /> of non-resident individuals exceed 24 for at least 60 days per year, or <br /> the number of service connections exceed four, a yearly permit to <br /> operate a public water system under the provisions of Title 22, CCR, <br /> will be required by the Environmental Health Division and San Joaquin <br /> County Development Title Section 9-1120.2 and 9-1115.9. <br /> 5. Refuse, garbage, and other solid waste material must be stored, <br /> removed and transported to an approved landfill in accordance with <br /> San Joaquin County Ordinance Code, Section 5-2400. <br /> 6. No Food prepared on the premise. <br />