My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002478_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11374
>
2600 - Land Use Program
>
SA-01-41
>
SU0002478_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:11 PM
Creation date
9/8/2019 12:51:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002478
PE
2633
FACILITY_NAME
SA-01-41
STREET_NUMBER
11374
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
APN
20103019
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
11374 S HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\11374\SA-01-41\SU0002478\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCGNET STL Project No. 0010771 <br /> Appendix B <br /> 7-sting Labs Page B.1 <br /> APPENDIX B <br /> EARTHWORK SPECIFICATIONS <br /> GENERAL <br /> SCOPE OF WORK: These specifications and applicable plans pertain to and include all earthwork <br /> associated with the site rough grading, including but not limited to the furnishing of all labor, tools, and <br /> equipment necessary for site clearing and grubbing, stripping, preparation of foundation materials for <br /> receiving fill, excavation, processing, placement and compaction of fill and backfill materials to the <br /> lines and grades shown on the project grading plans, and disposal of excess materials. <br /> PERFORMANCE: The Contractor shall be responsible for the satisfactory completion of all <br /> earthwork in accordance with the project plans and specifications. This work shall be inspected and <br /> tested by a representative of Signet Testing Labs, Inc., hereinafter known as the Soils Engineer and/or <br /> .. Testing Agency. Attainment of design grades when achieved shall be certified to by the project Civil <br /> Engineer. Both the Soils Engineer and the Civil Engineer are the Owner's representatives. If the <br /> Contractor should fail to meet the technical or design requirements embodied in this document and on <br /> the applicable plans, he shall make the necessary readjustments until all work is deemed satisfactory as <br /> determined by both the Soils Engineer and the Civil Engineer. No deviation from these specifications <br /> shall be made except upon written approval of the Soils Engineer, Civil Engineer or project Architect. <br /> No earthwork shall be performed without the physical presence or approval of the Soils Engineer. The <br /> Contractor shall notify the Soils Engineer at least two (2) working days prior to the commencement of <br /> any aspect of the site earthwork. <br /> The Contractor agrees that he shall assume soil and complete responsibility for job site conditions <br /> during the course of construction of this project, including safety of all persons and property; that this <br /> requirement shall apply continuously and not be limited to normal working hours; and that the <br /> Contractor shall defend, indemnify and hold the Owner and the Engineers harmless from any and all <br /> _ liability, real or alleged, in connection with the performance of work on this project, except for liability <br /> arising from the soil negligence of the Owner or the Engineers. <br /> TECHNICAL REQUIREMENTS: All compacted materials shall be densified to a density not less that <br /> 90 per cent relative compaction based on ASTM Test Method D1557-78, UBC or CAL-216, as <br /> specified in the technical portion of the Soil Engineer's report. The location and frequency of field <br /> density tests shall be as determined by the Soils Engineer. The results of these tests and compliance <br /> ` with these specifications shall be the basis upon which satisfactory completion of work will be judged <br /> by the Soils Engineer. <br /> I" SOILS AND FOUNDATION CONDITIONS: The Contractor is presumed to have visited the site <br /> and to have familiarized himself with existing site conditions and the contents of the data presented in <br /> the soil report. <br /> 1417 No. Market Blvd.,Suite 1 . Sacramento,CA 95834 • (916) 568-5858 • Fax: (916)568-5813 <br />
The URL can be used to link to this page
Your browser does not support the video tag.