My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002478_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11374
>
2600 - Land Use Program
>
SA-01-41
>
SU0002478_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:11 PM
Creation date
9/8/2019 12:51:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002478
PE
2633
FACILITY_NAME
SA-01-41
STREET_NUMBER
11374
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
APN
20103019
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
11374 S HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\11374\SA-01-41\SU0002478\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sl"INET STL Project No. 0010771 <br /> 7 san Labs Appendix B <br /> Page B.2 <br /> The Contractor shall make his own interpretation of the data contained in said report, and the <br /> Contractor shall not be relieved of liability under the contractor for any loss sustained as a result of any <br /> variance between conditions indicated by or deduced from said report and the actual conditions <br /> encountered during the progress of the work. <br /> DUST CONTROL: The work includes dust control as required for the alleviation or prevention of <br /> any dust nuisance on or about the site or the borrow area, or off-site if caused by the Contractor's <br /> operation either during the performance of the earthwork or resulting from the conditions in which the <br /> Contractor leaves the site. The Contractor shall assume all liability, including court costs of <br /> codefendants, for all claims related to dust or windblown materials attributable to his work. <br /> �. SITE PREPARATION <br /> Site preparation shall consist of site clearing and grubbing and the preparations of foundation materials <br /> for receiving fill. <br /> CLEARING AND GRUBBING: The Contractor shall accept the site in this present condition and <br /> shall demolish and/or remove from the area of designated project, earthwork all structures, both <br /> surface and subsurface, trees, brush, roots, debris, organic matter, and all other matter determined by <br /> the Soils Engineer to be deleterious. Such materials shall become the property of the Contractor and <br /> shall be removed from the site. <br /> Tree root systems in proposed building areas should be removed to a minimum depth of three (3.0) feet <br /> and to such a extent which would permit removal of all roots larger than one (1) inch. Tree root <br /> removed in parking areas may be limited to the upper one and one-half(1%) feet of the ground surface. <br /> Backfill or tree root excavation should not be permitted until all exposed surfaces have been inspected <br /> and the Soils Engineer is present for the proper control of backfill placement and compaction. Burning <br /> ` in areas that are to receive fill materials shall not be permitted. <br /> SUBGRADE PREPARATION: Surfaces to receive Engineered Fill, building or slab loads shall be <br /> ` prepared as outlined above, scarified to a depth of six (6) inches, moisture-conditioned as necessary, <br /> and compacted to 90% relative compaction. <br /> Loose and/or areas of disturbed soils shall be moisture conditioned and compacted to 90% relative <br /> compaction. All ruts, hummocks, or other uneven surface features shall be removed by surface <br /> grading prior to placement of any fill material. All areas that are to receive fill materials shall be <br /> .. approved by the Soils Engineer prior to the placement of any of the fill material. <br /> EXCAVATION: All excavation shall be accomplished to the tolerance normally defined by the Civil <br /> Engineer as shown on the project grading plans. All over excavation below the grades specified shall <br /> be backfilled at the Contractor's expense and shall be compacted in accordance with the applicable <br /> technical requirements. <br /> FILL AND BACKFILL MATERIAL: No material shall be moved or compacted without the <br /> presence of the Soils Engineer. Material from the required site excavation may be utilized for <br /> construction site fills provided prior approval is given by the Soils Engineer. All materials utilized for <br /> constructing site fills shall be free from vegetable or other deleterious matter as determined by the Soils <br /> Engineer. <br /> 1417 No.Market Blvd.,Suite 1 • Sacramento,CA 95834 • (916)568-5858 • Fax: (916)568-5813 <br />
The URL can be used to link to this page
Your browser does not support the video tag.