Laserfiche WebLink
Record. (Resolution R-00-433) <br /> f. The Regional Traffic Impact Fee shall be required for this development. The fee is,due and payable <br /> at the time o6uilding permit application. The fee currently is$1,310.00 per 1,000 gross square feet <br /> of building designated as Office. The fee is based on the current schedule. (Resolution R-06-38) <br /> a <br /> g. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall require a <br /> State NPDES construction permit. <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact: Michael Escotto, 468-3443) <br /> a. Open, pump;and backfill the septic tank, seepage pit, or excavation under permit and inspection by <br /> Environmental Health. (Development Title Sections 9-1110.3 and 9-1110.4) <br /> b. Destroy any abandoned wells under permit and inspection by Environmental Health. (Development <br /> Title Section 9-1115.5[e]) <br /> c. Any geotechnical drilling shall be conducted under permit and inspection by Environmental Health. <br /> (Development Title Sections 9-1115.3 and 9-1115.6) <br /> d. Refuse, garbage, and other solid waste material must be stored, removed, and transported to an <br /> approved landfill in accordance with San Joaquin County Ordinance Code Section 5-2400). <br /> e. Demolition of,all dilapidated structures and removal of all demolition material from the premises to an <br /> approved landfill site are required in accordance with San Joaquin County Ordinance Code Section <br /> 5-2401. <br /> 4. COUNCIL OF GOVERNMENTS(Staff Contact: Erin Sickler, 468-3913) <br /> a. The applicankshall participate in the San Joaquin County Mufti-Species Habitat Conservation and <br /> Open Space Plan (SJMSCP) or provide alternative mitigation in an amount and kind equal to that <br /> provided in the SJMSCP <br /> San Joaquin County. PA-0600678\Lowry <br /> `.. Community Development Page 8 <br />