Laserfiche WebLink
PA-1700032 (UP), S00011448 Page 4 of 4 <br /> 12001 S. Hwy 99, Manteca Date: September 1, 2017 <br /> calendar days before implementing any modifications. As part of the notification <br /> process, the owner or operator shall consult with our department (administering <br /> agency) when determining whether the RMP should be reviewed and <br /> revised. Where prenotification is not reasonably possible, the owner or operator <br /> shall provide written notice to our department (administering agency) no later than <br /> 48 hours following the modification. <br /> (2) Establish procedures to manage the proposed modification, which shall be <br /> substantially similar to the procedures specified in Sections 2760.6 and 2760.7 <br /> (Management of Change, Pre-Startup Safety Review), and notify our department <br /> (administering agency) that the procedures have been established. <br /> (b) The owner or operator of the stationary source shall revise the appropriate <br /> documents, as required pursuant to section (a), expeditiously, but not later than 60 <br /> days from the date of the stationary source modification. <br /> Also according to CCR, Title 19, Section 2745.12 for Certificate of Occupancy: <br /> New or modified stationary sources shall comply with Section 65850.2(b) of the <br /> Government Code prior to the issuance of a certificate of occupancy. <br />