My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18566
>
2600 - Land Use Program
>
PA-0200632
>
SU0004784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:54 PM
Creation date
9/8/2019 12:53:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004784
PE
2656
FACILITY_NAME
PA-0200632
STREET_NUMBER
18566
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
01709030
ENTERED_DATE
1/20/2005 12:00:00 AM
SITE_LOCATION
18566 N HWY 99
RECEIVED_DATE
1/18/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\18566\PA-0200632\SU0004784\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. SCREENING: Screening shall be provided and complv with the following: <br /> (1) Screening shall be erected along the property line of APN 017-090-47 (Development Title <br /> Section 1022.4[d][1]). The existing cypress planted three feet on center meets this requirement. <br /> (2) All storage materials and related activities, including storage areas for trash, shall be screened <br /> so as not to be visible from adjacent properties and public rights-of-way. Screening shall be six <br /> (6)to seven (7)feet in height. Outside storage is not permitted in front yards, street side yards, <br /> or in front of main buildings. (Development Title Section 1022.4[d][2]) <br /> (3) Screening shall be erected along the northern and eastern property lines of Assessor Parcel <br /> No. 017-09-29, as follows: <br /> A. Along the northern property line of APN 017-09-29, cypress trees shall be planted five feet <br /> on center to create a visual screen in accordance with Development Title Section 9- <br /> 1022.4(c). <br /> B. Along the eastern property line of APN 017-09-29, honey suckle or similar vines shall be <br /> planted adjacent to the existing cyclone fence in order that the vines will create a visual <br /> screen in accordance with Development Title Section 9-1022.4(c). <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Gabe Karam, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to the issuance of the occupancy permit. (Development Title Section <br /> 9-1145.5) <br /> c. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a 25- <br /> foot-wide right-of-way from the centerline of Clarksdale Road to the property across the parcel's <br /> frontage. A$350.00 fee currently is required for processing, per Development Title Table 9- <br /> 240.2, in addition to a copy of the Grant Deed. The fee due will be based on the current fee <br /> schedule. (Development Title Section 9-1150.5) <br /> d. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $654.00 per 1000 gross <br /> square feet of building designated as Manufacturing in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolution R-00-433) <br /> e. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> f. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> g. The applicant shall obtain a Storm Water Pollution Prevention Plan (SWPP) permit from the State <br /> Water Resources Control Board prior to the beginning of any construction, if more than five acres <br /> are disturbed. <br /> Revised Conditions of Approval - 3 - PA-0200632 <br />
The URL can be used to link to this page
Your browser does not support the video tag.