My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009415
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18621
>
2600 - Land Use Program
>
PA-1200221
>
SU0009415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:03 PM
Creation date
9/8/2019 12:53:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009415
PE
2631
FACILITY_NAME
PA-1200221
STREET_NUMBER
18621
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
01322035
ENTERED_DATE
11/13/2012 12:00:00 AM
SITE_LOCATION
18621 N HWY 99
RECEIVED_DATE
11/13/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\18621\PA-1200221\SU0009415\APPL.PDF \MIGRATIONS\N\HWY 99\18621\PA-1200221\SU0009415\CDD OK.PDF \MIGRATIONS\N\HWY 99\18621\PA-1200221\SU0009415\EH COND.PDF \MIGRATIONS\N\HWY 99\18621\PA-1200221\SU0009415\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Noise <br /> Development Title Table 9-1025.9 Part I lists Educational Services-General as a noise <br /> sensitive land use. The 65 dB contour line along North State Route 99 West Frontage <br /> Road is located 704 feet from the side of the road. However, the project site lies outside <br /> of the 65 dBL noise contour for North State Route 99 West Frontage Road. The <br /> buildings are located 720 feet away from the front property line, which falls outside of the <br /> 65dB contour line. If the use is proposed within the 65 dB contour line, then a noise <br /> study shall be required to analyze the impact of transportation noise on the interior <br /> space use. <br /> Initial Study <br /> The Initial Study will be posted once the technical memo is completed and the <br /> Department of Public Works reviews the memo. The Initial Study must be circulated for <br /> a minimum of thirty (30) days at the State Clearinghouse before the project can be heard <br /> by the Planning Commission. <br /> The Community Development Department has reviewed the project and will make a <br /> recommendation to the Planning Commission once the outstanding issues have been <br /> resolved. <br /> MH:vb <br /> PA-1200221(SA)DC01 162013 <br /> Attachments <br /> CFaith Community Church Nazarene <br /> Lodi Christian School <br />
The URL can be used to link to this page
Your browser does not support the video tag.