Laserfiche WebLink
oPau�nr C, <br /> COUNTY OF SAN JOAQUIN <br /> Z' 2 EUGENE DELUCCHI <br /> y :< DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON,CALIFORNIA 95201 DEPUTY DIRECTOR <br /> C' �P (209)468-3000 MANUEL LOPEZ <br /> F6R� FAX(209)468-2999 DEPUTY DIRECTOR <br /> ARD C. <br /> HENRY M. HIRATA R DE UT DIRECTORE <br /> DIRECTOR -7 '`• <br /> December 9 , 1992 <br /> M E M O R A N D U M 19 <br /> TO: Thomas M. Gau, Senior Civil Engineer /��/', ;� � ;.� <br /> Community Development Department Dpig�����' <br /> CONTACT PERSON: Richard Larrouy <br /> FROM: Charles Kelley, Senior Civil Engineep- <br /> Public Services Division <br /> SUBJECT: SA-92-64 for a contractors office and storage yard. <br /> Located on the W. side of State Route 99 , N. of Mokelumne River, N. <br /> of Lodi. <br /> APPLICANT: Christy Brothers APN: 013-220-36 <br /> INFORMATION: <br /> Portion of the site is located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area (Zone A14) . <br /> North 99 Frontage Road (west) has an existing right-of-way width of <br /> 56 feet, and a planned right-of-way width of 56 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $2 , 079 . 00 <br /> per 1, 000 gross square foot of building as "Service Commercial" <br /> in the Lodi area. The fee shall be automatically adjusted July <br /> 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> 2 . Any additional run-off into the ditch along North 99 Frontage <br /> Road shall be retained on-site or metered. <br /> (Planning Title Section 9-10002) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 1 <br />