Laserfiche WebLink
GRO UND WA TER INFORMATION <br /> /The Map,Lines of Equal Depth to Water, Spring 1999 shows approximately 45'to static water. <br /> Several City of Lodi wells exist in the search area. <br /> j/A community garden exists on the adjacent northerly parcel. Irrigation was underway and <br /> observed on 8/21/06. Internal irrigation ditches were flowing approximately % full. What type of <br /> controls are in place with respect to herbicides and pesticides is not known. A hazardous waste <br /> site exists at 110 E. Turner Road. The site is south of the Mokelumne River and more than %2 mile <br /> distant from the site. <br /> The existing well on Parcel 2 was sampled and tested by FarWest Labs. The results show <br /> DBCP<0.01 ug/L and Nitrates 4.3 mg/L. The water meets California Drinking Water Standards <br /> with respect to the two tests required. <br /> ,/No third party is involved in the water sampling and testing..No representative of Smith & <br /> Associates was present when the water sample was taken. The log of samples taken is included in <br /> this report along with the test results. <br /> SOIL PROFILE INFORMATION <br /> The Tentative Parcel Map shows the location of the test holes.No pit was dug, as the <br /> classification of the soil is made at the time of the drilling. <br /> The soil is classed as Tokay. The top 7'to 8'is silty sand, non plastic. Clay began at the <br /> approximate 8'depth and continued to 25'. The 8'-25' strata was interspersed with some gravel <br /> layers and thin layers of sand. No water was observed in the test holes. <br /> As observed in the field,the sand strata should support a primary SFR and a second unit dwelling <br /> as well. <br /> PERCOLATION TEST INFORMATION <br /> /The location of the test holes are lotted on the TPM included. While shallow 42" holes were <br /> P ( ) <br /> tested, drilling to 25' for a profile was completed but not tested at that depth.No water was <br /> evident in the 25'hole. <br /> The shallow hole on Parcel 1 and 2 were tested on 8/21/06. The holes were 6" in diameter and <br /> 42" deep. The holes were sleeved with a 4" PVC pipe. On 8/20/06 at 0800, 12" of water was <br /> placed in each shallow hole. Two inches of gravel was placed n the bottom of each hole and <br /> around the exterior of the PVC pipe. (See Hole Preparation Sheet/Smith&Assoc.) <br /> The holes were dry at 0800, 8/21/06. Both holes were rapid perc rates. Procedure No. 3 was <br /> followed. A representative at the EHD advised we start the one hour test at 1015 hours and an <br /> inspector would arrive for the required readings. The testing conformed to SJC Policy EHD 02- <br /> 02. The field form used for recording data is included. Mr. Mike Escotto of the EHD of SJC was <br /> present for the required readings and signed the field form. <br /> 2. <br />