My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002728
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22364
>
2600 - Land Use Program
>
SA-99-11
>
SU0002728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:45 PM
Creation date
9/8/2019 12:55:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002728
PE
2633
FACILITY_NAME
SA-99-11
STREET_NUMBER
22364
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
ACAMPO
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
22364 N HWY 99 RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\22364\SA-99-11\SU0002728\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. LIGHTING: Lighting shall be provided and comply with the following: <br /> (1) A strobe light shall be placed atop the monopole tower to mitigate any obstructions <br /> to low flying aircraft during inclement and foggy weather. <br /> 2. DEPARTMENTOF PUBLIC WORKS (Staff Contact: Gabe Karam,468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordancewith the requirementsof San <br /> Joaquin County Standard R-17 prior to issuance of the occupancy permit. (Development <br /> Title Section 9-1145.5) <br /> C. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is$573.00 per 1,000 <br /> gross square feet of building designated as Manufacturing in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolution R-96-592) <br /> d. A copy of the Final Site Plan shall be submitted prior to release of the building permit. <br /> 3. PUBLIC HEALTH SERVICES (Staff Contact: Ted Norgard,468-3443) <br /> a. If the cellular tower foundation requires soil boring,a soil boring permitshall be required prior <br /> to commencementof soil boring. <br /> Conditions of Approval -2 - SA-99-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.