Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1600194 <br /> RIGOBERTO GAMAIDILLON & MURPHY <br /> Use Permit application No. PA-1600194 was approved by the San Joaquin County Planning <br /> Commission on May 18, 2017. The effective date of approval is May 28, 2017. This approval will <br /> expire on Error! Reference source not found., which is 18 months from the effective <br /> date of approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been issued and remain in force, and (3) all necessary permits from other <br /> agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Megan Aguirre, [209]468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a truck parking facility for Peterbuilt Truck or similar trucks to <br /> be built in two phases over 5 years as shown on the revised Site Plan dated April 25, 2017. Phase <br /> One, with building permits to be issued within 18 months from the effective date of approval, includes <br /> the construction of a 1,400 square foot office and parking for 63 trucks with double trailers. Phase <br /> Two, with building permits to be issued within 5 years from the effective date of approval, includes <br /> the construction of a 7,000 square foot shop and a 4,000 square foot office addition. (Use Type: <br /> Truck Sales & Services- Parking) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. AGRICULTURAL MITIGATION: Agricultural mitigation is required for the 3.59 acres of APN No. <br /> 013-190-05. The mitigation instrument to provide agricultural mitigation land shall be required prior to <br /> the issuance of the Grading or Building permit. (Development Title Section 9-1080) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> (2) A minimum of one (1) parking space shall be provided for Phase One and a minimum of eleven <br /> (11) additional parking spaces shall be provided for Phase Two for a total of twelve (12) parking <br /> spaces at full buildout. (One [1] space is required for every 1,000 square feet of building area.) <br /> (Development Title Section 9-1015.3) <br /> PA-1600194 Conditions of Approval 1 <br />