My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011280
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22420
>
2600 - Land Use Program
>
PA-1600194
>
SU0011280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:06 PM
Creation date
9/8/2019 12:55:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011280
PE
2626
FACILITY_NAME
PA-1600194
STREET_NUMBER
22420
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220-
APN
01319005
ENTERED_DATE
3/23/2017 12:00:00 AM
SITE_LOCATION
22420 N HWY 99
RECEIVED_DATE
3/21/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\22420\PA-1600194\SU0011280\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1600194 <br /> RIGOBERTO GAMAIDILLON & MURPHY <br /> Use Permit application No. PA-1600194 was approved by the San Joaquin County Planning <br /> Commission on May 18, 2017. The effective date of approval is May 28, 2017. This approval will <br /> expire on Error! Reference source not found., which is 18 months from the effective <br /> date of approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been issued and remain in force, and (3) all necessary permits from other <br /> agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Megan Aguirre, [209]468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a truck parking facility for Peterbuilt Truck or similar trucks to <br /> be built in two phases over 5 years as shown on the revised Site Plan dated April 25, 2017. Phase <br /> One, with building permits to be issued within 18 months from the effective date of approval, includes <br /> the construction of a 1,400 square foot office and parking for 63 trucks with double trailers. Phase <br /> Two, with building permits to be issued within 5 years from the effective date of approval, includes <br /> the construction of a 7,000 square foot shop and a 4,000 square foot office addition. (Use Type: <br /> Truck Sales & Services- Parking) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> d. AGRICULTURAL MITIGATION: Agricultural mitigation is required for the 3.59 acres of APN No. <br /> 013-190-05. The mitigation instrument to provide agricultural mitigation land shall be required prior to <br /> the issuance of the Grading or Building permit. (Development Title Section 9-1080) <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> (2) A minimum of one (1) parking space shall be provided for Phase One and a minimum of eleven <br /> (11) additional parking spaces shall be provided for Phase Two for a total of twelve (12) parking <br /> spaces at full buildout. (One [1] space is required for every 1,000 square feet of building area.) <br /> (Development Title Section 9-1015.3) <br /> PA-1600194 Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.