Laserfiche WebLink
(11)Pursuant to Table 4-3 of the California Plumbing Code, toilet facilities shall be accessible to <br /> employees at all times, should not be more that 500 feet from where employees are regularly <br /> employed and accessible by not more than one flight of stairs. The plans shall indicate the <br /> location of the toilet facilities and the travel distance from work areas. <br /> (12)This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, title 22, Division 2, Chapter 2.7 <br /> I. CALIFORNIA FIRE CODE:The following California Fire Code (CFC) requirements will be applicable <br /> to the proposed project. The following conditions shall be addressed prior to submittal of a building <br /> permit application to the Building Inspection Division: <br /> (1) CFC 507 Fire Protection Water Supply - Fire flow and hydrants shall be provided for the <br /> proposed project by the use of: CFC Appendix B. <br /> (2) Fire Protection Systems required shall be installed according to the CFC, Chapter 9 and the <br /> appropriate standards and guides adopted in Chapter 35 of the California Building Code and the <br /> California Electrical Code. <br /> (3) CFC, Section 503 Fire Apparatus Access Roads-Shall be provided as required by this section. <br /> 503.1.2-A secondary access may be required. <br /> (4) CFC, Section 906 Portable Fire Extinguishers— Provide portable fire extinguishers as required <br /> by this section. <br /> (5) CFC, Section 506 Key Box -A Knox® Box shall be installed according to the local fire district's <br /> instructions. Make application for the key box at the Woodbridge Fire District. If there is an <br /> electronically controlled access gate at this site a Knox®key switch will also be required. <br /> (6) CFC, Section 5001.3.3.1 Properties of Hazardous Materials — A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> (7) CFC, Section 105 Permits: Operational Permit(s)may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, [209]468-3023) <br /> a. An encroachment permit shall be required from Caltrans for all work within road right-of-way. <br /> b. Proposed landscaping along roadway shall not obstruct sight distance from the driveway or at the <br /> intersection. <br /> c. All signs visible to traffic on State facilities need to be constructed in compliance with local <br /> government and State regulations. Information regarding the State's regulation of outdoor <br /> advertising may be found online at http://www.dot.ca.gov/hq/oda <br /> d. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link fence <br /> or equal when the maximum design depth is 18 inches or more. Required retention basin <br /> capacity shall be calculated and submitted along with a drainage plan for review and approval, <br /> prior to release of building permit. (Development Title Section 9-1135) <br /> e. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule <br /> at the time of payment. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> PA-1600194 Conditions of Approval 5 <br />