My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011280_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22420
>
2600 - Land Use Program
>
PA-1600194
>
SU0011280_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:20 PM
Creation date
9/8/2019 12:55:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011280
PE
2626
FACILITY_NAME
PA-1600194
STREET_NUMBER
22420
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220-
APN
01319005
ENTERED_DATE
3/23/2017 12:00:00 AM
SITE_LOCATION
22420 N HWY 99
RECEIVED_DATE
3/21/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\22420\PA-1600194\SU0011280\SS_NL STDY .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Suitability/ Nitrate Loading Study 11'�rracon <br /> { Sun Valley Express Truck Center ■ Acampo, California <br /> August 14, 2017 ■ Terracon Project No. NA177026 <br /> however the deep percolation test met the standard minimum 30 minutes per inch by EHD for <br /> seepage pits. <br /> The parcel appears suitable for the use of a standard septic system utilizing shallow leach lines <br /> with septic pits. Given the low permeable surface soils, the septic pits shall be the primary <br /> absorption measure. All final septic system construction should follow the San Joaquin County <br /> On-Site Wastewater Disposal Standards where applicable. <br /> Based on the method and assumptions described, the results of the nitrate loading balance <br /> indicated that the proposed development at the site should not cause a buildup of nitrates in the <br /> aquifer above 10 mg/L-N. <br /> A groundwater sample could not be collected since there wasn't a water source on site(Refer to <br /> Section 1.4.3). <br /> 4.0 LIMITATIONS <br /> Our professional services were performed, our findings obtained, and our conclusions proposed <br /> in accordance with generally accepted engineering principles and practices. This warranty is in <br /> lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> • <br /> • <br /> Responsive r: Resourceful , Reliable 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.