Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> UP-92-7 <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way . <br /> ( Streets and Highway Title Section 10-3103 ) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of <br /> building permit application . (The fee currently is $282 .78 <br /> per trip-end generated in the Lodi area. If there is no <br /> building permit required, the fee will be exempt . The fee <br /> shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolution R-90-309 ) <br /> c : Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />