Laserfiche WebLink
LANDUSE CONDITIONS FOR 24155 N HWY 99 <br /> A. An addendum to the Soil Suitability/Nitrate Loading Study dated September 24, <br /> 2003 incorporating the maximum number of proposed customers and employees shall be <br /> submitted to the Environmental Health Department for review and approval <br /> prior to issuance of building permits (San Joaquin County <br /> Development Title, Section 9-1105.2 (d). A review fee of$465.00 must be paid at time of <br /> submittal to Environmental Health. `,FM <br /> NOTE: If the applicant proposes to install floor drains and wastewater is to be discharged <br /> into the septic system, calculations for the amount of wastewater n shall be <br /> included in the Soil Suitability/Nitrate Loading Studyadd.a.'t. , fi° 4 -;-P-- <br /> B.11:05 <br /> ""B.11:05 (a) (without last sentence then add): Credit shall be given for the existing <br /> septic system and should be addressed in the Soil Suitability/Nitrate Loading Study <br /> addendum. In addition, the revised site plan shall incorporate the 100% designed sewage <br /> disposal replacement area(s) demonstrating that the 100% replacement meets the <br /> minimum distance requirement from the drainage pond. The distance required in feet <br /> equals four times the vertical height of the pond. Distance is measured from the top edge <br /> of the bank. The revised site plan shall be submitted to and approved by the <br /> Environmental Health Department prior to issuance of building permits. <br /> L . it : t)3',L C; at ( <br /> —0.10:08 <br /> NOTE: The applicant proposes to pump whey from tanks into holding tank of a pump <br /> truck and to transport whey to a number of local dairies. The Regional Water Quality <br /> Control Board shall be contacted for any requirements to be satisfied prior to approval of <br /> the project including any proposal to have wash-water from floor drains discharged into <br /> the existing drainage pond. <br /> b-22:04 (Drop first sentence) <br /> Y: The State Department Milk and Dairy Foods Control shall be contacted for licensing <br /> and any other requirements to be satisfied prior to approval of the project. <br /> ;-X.144.01 <br /> NOTE: It is the EHD's understanding that the existing food facility will be removed and <br /> is proposed to be reestablished in the new constructed building in Phase I1. A revised site <br /> plan shall demonstrate floor plan and plumbing layouts for the proposed uses prior to <br /> approval of project <br />