Laserfiche WebLink
%-' J <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-95-02 (REVISION) <br /> A $260 . 00 fee currently is required for processing per Development Title <br /> Table 9-240 . 2 in addition to a copy of the Grant Deed and an estimate for <br /> the required frontage improvements . The estimate and legal description <br /> shall be prepared by a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Department of Public Works and <br /> submitted to the Department of Public Works for approval . As an option, <br /> the Department of Public works will prepare the drawing and estimate for <br /> an additional fee of $115 . 00 . <br /> (Development Title Section 9-1150 .2) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this development . <br /> The fee is due and payable at the time of building permit application. <br /> (The fee currently is $197 . 91 per daily trip-end generated in the Stockton <br /> area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News <br /> Record. ) <br /> (Resolutions R-90-304 , R-91-1025, R-93-167 and R-94-174) <br /> 5 . The Water Supply Facilities Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable prior to issuance of the building <br /> permit . The fee currently is $288 per 1, 000 gross square foot of building <br /> as Retail Service and Service Commercial . The fee shall be automatically <br /> increased on January 1 of each year through the year 2005 at the rate of <br /> 7 . 66 percent . <br /> (Development Title Section 9-818 .4 and Resolution R-91-327) <br /> 6 . A rraffie study shall be required te determine the number ef trip ends <br /> generated by this faellity and is determine the 'mpaeEs ae €§e <br /> and Read, and theirmKigaVens, whieh shat be the resile sib: , ' oyen <br /> the-applieant—'£he develeper shall depesit funds with the Gau rty-t-eT-a4ri- <br /> eest9, as estimated by the Department vffT'••c�blie erles P-mime—F-a{si0*4.5 <br /> __ . ______. ,___ , ___ ____ , r____ be Department of Pu. lis ..errs <br /> __-__-______g ___ the <br /> TMI :RH:sc <br /> PS-SD w"I <br /> c : Manuel Lopez, Deputy Director/Development <br />