Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> FOR SA-94-39 <br /> 2. The Traffic Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The <br /> fee is currently $761.00 per 1 ,000 gross square foot of building as <br /> "Manufacturing" or $197.91 per daily trip-end generated in the Stockton <br /> area . The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News <br /> Record. <br /> (Resolution R-90-304. R-91-1025. R-93-167 . R-94-174) <br /> 3. The Water Supply Facilities Impact Mitigation Fee will be required for <br /> this development. The fee is due and payable prior to issuance of the <br /> building permit. The fee is currently $0. 107 per gross square foot of <br /> building as "Manufacturing" . The fee shall be automatically increased on <br /> January 1 of each year at the rate of 7. 66 percent through the year 2005. <br /> (Resolution R-91-327) (Development Title Section 9-818.4) <br /> TMI :JZ: lt <br /> PS 4J214.C2 <br /> C : Manuel Lopez, Deputy Director/Development <br />