Laserfiche WebLink
install the"No Parking"zone signs/striping prior to the Certificate of Occupancy. <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact: Michael Escotto, 953-3443) <br /> a. A soil suitability/nitrate loading study incorporating proposed staff and customer use shall be <br /> submitted to <br /> Environmental Health to indicate that the area is suitable for septic system usage. The <br /> studies must,be approved by Environmental Health prior to issuance of building permits. . <br /> (Development Title Section 9-1105.2[d] <br /> b. Submit to Environmental Health revised site plans showing the maximum number of employees and <br /> customers or;parishioners the sewage disposal system is being designed for. In addition, show on <br /> revised plans that the leach field area will be barricaded so that it cannot be driven over, parked on, <br /> or used as a;storage area. This leach field area must be used for that specific purpose only,and it <br /> cannot contain under underground utility lines(Development Title Section 9-1110.4.[c][5]). In <br /> addition,the Tevised site plan shall incorporate the 100 percent designed sewage disposal <br /> replacement area. <br /> c. Construct a water well under permit and inspection by Environmental Health prior to occupancy. <br /> Should the riumber of non-resident individuals exceed 24 for at least 60 days per year, or the <br /> number of service connections exceeds four, a yearly permit to operate a public water system will be <br /> required by Environmental Health. (Development Title Sections 9-1120.2 and 9-11.15.9) <br /> The supplier must possess adequate financial, managerial, and technical capability to ensure the <br /> delivery of pure,wholesome, and potable drinking water in accordance with Development Title <br /> Sections 9-1120.2 and 9-1115.9, CCR, Title 22, and Health and Safety Code Sections 116525 <br /> through 116570) <br /> d. Construction of individual sewage disposal systems under permit and inspection by Environmental <br /> Health is required at the time of development based on the Soil Suitability/Nitrate Loading Study <br /> findings. (Development Title Sections 9-1110.3 and 9-1110.4) <br /> e. Any geotechnical drilling shall be conducted under permit and inspection by Environmental Health. <br /> (Development Title Sections 9-1115.3 and 9-1115.6) <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff Contact: Anne-Marie Poggio-Castillou, 468- <br /> 3913) <br /> a. This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP).. This can be up to a 30-day process, and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. Please contact SJMSCP staff regarding <br /> completing the following steps to satisfy SJMSCP requirements: <br /> (1) Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground <br /> disturbance. <br /> (2) Sign and return Incidental Take Minimization Measures to SJMSCP staff(given to time project <br /> applicant after the pre-construction survey is completed). <br /> (3) Pay the appropriate fee based on SJMSCP findings. <br /> (4) Receive the Certificate of Payment to release the required permit. <br /> San Joaquin County PA-0800108/Mahmood <br /> Community Development Page 12 <br /> i <br />