My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007124
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8606
>
2600 - Land Use Program
>
PA-0800108
>
SU0007124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:00 PM
Creation date
9/8/2019 1:00:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007124
PE
2626
FACILITY_NAME
PA-0800108
STREET_NUMBER
8606
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
08530032
ENTERED_DATE
4/9/2008 12:00:00 AM
SITE_LOCATION
8606 N HWY 99
RECEIVED_DATE
4/8/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\APPL.PDF \MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\CDD OK.PDF \MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\EH COND.PDF \MIGRATIONS\N\HWY 99\8606\PA-0800108\SU0007124\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
basin capacity shall be calculated by a registered civil engineer, licensed contractor,or an architect <br /> prior to the release of building permits. (Development Title Section 9-1135.9) <br /> e. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of-building permit application. The fee currently is$166.00 per daily trip-end generated in <br /> the Stockton':area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> f. The Regional Transportation Impact Fee shall be required for this development_ The fee is due and <br /> payable at the time of building permit application. The fee currently is$1,430.00 per 1,000 gross <br /> square feet of building designated as Service Commercial.-The fee is based on the current <br /> schedule. (Resolution R-06-38) <br /> g. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is <br /> due and payable prior to issuance of the building permit. The fee currently is$683.00 per 1,000 <br /> gross square feet of building designated as Service Commercial. The fee shall be automatically <br /> increased on January 1 of each year through the year 2015 at the rate of 4.55 percent. A credit may <br /> be allowed if it can be verified that the existing development on this site was in operation on or after <br /> April 30, 1991. (Development Title Section 9-818.4, Resolution R-97-5) <br /> h. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> Division 468-3066 that this development has <br />� i. Verification shall be obtained from the Solid Waste ( ) P <br /> met the requirements of the Waste Plan Format for Development Projects: The Final Site Plan is <br /> required upon submittal of verification. <br /> .i, <br /> j. The proposed project is classified as a Priority Project in the County Phase I National Pollutant <br /> discharge Elimination Permit and must comply with the County Water Quality Control Criteria Plan by <br /> filtering, treating, infiltrating the 85ti"percentile storm. <br /> k. Dischargers whose projects disturb one or more acres of soil or whose projects disturb less than one <br /> acre but are part of a larger common.plan of development that in total disturbs one or more acres are <br /> r e General Permit far Discharges es of Storm Water Associated <br /> obtain coverage under the 9 <br /> required to g . <br /> With Construction Activity <br /> Construction General Permit 99-08-DWQ). Construction activity subject <br /> to this permit,includes clearing, grading, and disturbances to the ground such as stockpiling or <br /> excavation does not include regular maintenance activities performed to restore the original line, <br /> grade, or capacity of the facility. <br /> one acre or greater will require the preparation <br /> result in soil disturbance of o q p P <br /> I. Construction sites that 9 <br /> and implementation of a Storm Water Pollution Prevention Plan (SWPP) meeting the requirements of <br /> the State Water Resources Control Board (SWRCB)Order No. 99-08-DWQ,Waste Discharge <br /> Requirements(WDRs)for Discharges of Storm Water Runoff Associated With Construction Activity <br /> (General Permit). <br /> m. A San Joaquin County Storm Water Discharge Permit is required for this project. <br /> n. Based on the.revised site plan with a one-way ingress driveway and a one-way egress driveway, a <br /> raised median is not'required. <br /> o. Prior to the release of building permits, the applicant must pay a fee of$320.00 to process a request <br /> to the Board,.of Supervisors to establish a"No Parking"zone along the project frontage. In the event <br /> that the"No Parking"zone is approved, the applicant shall pay the fee of$875.00 to furnish and <br /> San Joaquin County PA-08001081Mahmood <br /> Community Development Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.