My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006750
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3836
>
2600 - Land Use Program
>
PA-0700438
>
SU0006750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:42 AM
Creation date
9/8/2019 1:02:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006750
PE
2632
FACILITY_NAME
PA-0700438
STREET_NUMBER
3836
Direction
N
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
APN
13206002
ENTERED_DATE
10/2/2007 12:00:00 AM
SITE_LOCATION
3836 N NEWTON RD
RECEIVED_DATE
10/1/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NEWTON\3836\PA-0700438\SU0006750\APPL.PDF \MIGRATIONS\N\NEWTON\3836\PA-0700438\SU0006750\CDD OK.PDF \MIGRATIONS\N\NEWTON\3836\PA-0700438\SU0006750\EH COND.PDF \MIGRATIONS\N\NEWTON\3836\PA-0700438\SU0006750\BP REL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety is a prime concern of Traylor Shea Precast, and our safety program receives the <br /> highest attention of both management and the line personnel. Our Incident Rates are well below the <br /> national average, and our goals continue to push our commitment to safety excellence. <br /> Yard Surfacine <br /> As you will note on the submitted site plan,the AC surfacing is limited to the parking lot <br /> only. Based on our extensive experience with similar facilities and equipment,we do not use any <br /> asphalt or concrete paving in the storage yards or around the buildings. In fact, during our property <br /> search we specifically avoid sites with existing paving as the nature of our operation is guaranteed to <br /> destroy any such surfaces due to the heavy duty forklifts and the heavy segment weights. Also,the <br /> exact location of the segments in the storage yard is constantly changing as product is produced and <br /> shipped. At times it is necessary to segregate certain segments due to manufacturing differences. <br /> Other times the segments must be held for additional time to gain strength. These factors preclude <br /> fixed storage arrangements,preclude fixed maneuvering lanes, and preclude the use of any surfacing <br /> other than crushed base. The crushed base is placed,watered, and compacted to provide a stable and <br /> flat surface. The material is specially graded to minimize dust, and we have on-site a dedicated water <br /> truck to further minimise dust generation. We request approval of our surfacing plan as shown. <br /> We look forward to working with you on this project. Please call the undersigned if you have <br /> any questions. <br /> Very truly yours, <br /> Traylor Shea Precast,A Joint Venture <br /> Chris Hebert <br /> General Manager <br /> File: SU— 13.5 <br /> GEW <br /> DH <br />
The URL can be used to link to this page
Your browser does not support the video tag.