Laserfiche WebLink
p � y <br /> Figure 7—Stacking Figure 8 Storage <br /> Figure 9— Loading onto truck <br /> Schedule <br /> The UNWI Tunnel Project is to be completed on a fixed schedule, with associated liquidated <br /> damages for late completion. The supply of the precast concrete tunnel segments is critical to the <br /> project schedule, so accordingly the permitting and construction of the manufacturing facility must <br /> be expedited. <br /> Once the facility is constructed, the casting is typically done on two shifts per day,with each <br /> shift being 8 hours. Production is planned for 5 days per week(Monday through Friday), but we will <br /> operate on the weekends if the schedule requires it. The UNWI project will required approximately <br /> 11 months to cast. <br /> Labor <br /> When the plant is running two shifts per day, we will employ approximately 40 personnel (20 <br /> per shift). This includes both hourly and salaried employees. The vast majority of the labor will be <br /> sourced locally, and we employ pre-hire drug testing,physicals, and interviews for all employees. <br /> We provide good wages,benefits, and training, and we anticipate signing an agreement with the <br /> Laborer's International Union of North America(LIUNA)for the hourly workforce. <br />