My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004276
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3851
>
2600 - Land Use Program
>
PA-0300136
>
SU0004276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:37 AM
Creation date
9/8/2019 1:02:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004276
PE
2632
FACILITY_NAME
PA-0300136
STREET_NUMBER
3851
Direction
N
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
APN
09218008
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
3851 N NEWTON RD
RECEIVED_DATE
4/8/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NEWTON\3851\PA-0300136\SU0004276\APPL.PDF \MIGRATIONS\N\NEWTON\3851\PA-0300136\SU0004276\CDD OK.PDF \MIGRATIONS\N\NEWTON\3851\PA-0300136\SU0004276\EH COND.PDF \MIGRATIONS\N\NEWTON\3851\PA-0300136\SU0004276\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-136(SA) <br /> RECOMMENDATIONS: <br /> I. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $1,755.00 per <br /> 1,000 gross square foot of building designated as Office in the Stockton area. The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee may be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is <br /> $53.00 per 1,000 gross square foot of building designated as Office. The fee shall be <br /> automatically increased on January 1 of each year through the year 2005 at the rate of 7.66 <br /> percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. All new structures and/or substantially improved structures constructed on this parcel shall <br /> be elevated, including duct work and all equipments and utilities, a minimum of one (1) <br /> foot above the 100-year flood elevation of 27-feet. <br /> 7. The project shall require a State National Pollutant Discharge Elimination System <br /> (NPDES) construction permit. Additionally, applicant shall file a Notice of Intent (NOI) <br /> with the State Water Resources Control Board(SWRCB) and submit a Storm Water <br /> Pollution Prevention Plan (SWPPP) for approval. <br /> DTP:SH <br /> P KOMWTSA\Y 2W3TA43=36.vpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.