My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003058
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
4020
>
2600 - Land Use Program
>
SA-94-33
>
SU0003058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:39 AM
Creation date
9/8/2019 1:02:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003058
PE
2633
FACILITY_NAME
SA-94-33
STREET_NUMBER
4020
Direction
N
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
4020 N NEWTON RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NEWTON\4020\SA-94-33\SU0003058\APPL.PDF \MIGRATIONS\N\NEWTON\4020\SA-94-33\SU0003058\CDD OK.PDF \MIGRATIONS\N\NEWTON\4020\SA-94-33\SU0003058\EH COND.PDF \MIGRATIONS\N\NEWTON\4020\SA-94-33\SU0003058\LIQ WASTE PLN CK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Connect the return hose from the sand filter to the treatment tank. <br /> 7. Release the fresh water makeup float switch from its shipping position, and allow it to <br /> hang into the treatment tank. The bottom of the float should be between 12" and 18" <br /> from the bottom of the tank when in the correct position. If adjustment is required, <br /> release the strain relief securing the float to the tank, and reposition. <br /> 8. The low and high level switches are secured for shipping, and have been factory adjusted, <br /> but may have moved in transit. Remove the shipping bracket on the outside of each <br /> switch, and manually move the switches to ensure that they operate correctly. The <br /> distance that the floats move between "clicks" should not be less than 4" when the <br /> switches are moved manually. If adjustment is required, refer to the appendix section for <br /> details of adjustment procedures. Ensure that the switch floats are secure on the operating <br /> rods. <br /> 9. Connect the feed pump to the system inlet on the coalesces. Separate instructions are <br /> provided with the recommended pump. The high level switch in the treatment tank is for <br /> feed pump control. The lead from the control panel provides a controlled I I5 2 amp <br /> supply for this purpose. If a higher current supply is required, refer to a qualified <br /> electrician for the correct installation. <br /> 10. Connect the backwash pipe from the treatment system to the sump/storage tank. This <br /> should normally be a minimum of a 2" PVC connection with a maximum of a 100 ft <br /> gravity return to the sump/tank. If a greater distance is required, or a vertical run is <br /> required, please refer to the factory for further instructions. <br /> 11. Ensure that all system valves are closed (handles across the direction of flow) <br /> 12. Remove the top of the sand filter(see directions in the appendix) and using a hose, fill the <br /> filter with water above the level of the laterals. This is to prevent damage when the sand <br /> is added, and also assists in preventing "rat-holing" when filling the filter with sand. <br /> 13. Carefully add the required amount (see system specification table) of the correct grade of <br /> sand, levelling the sand as the filter is filled. <br /> 14. Remove any sand from the seal area of the filter seal, replace the lid, and the lid <br /> clamps or bolts. Refer to the directions in the Appendix section. <br /> IMPORTANT <br /> ENSURE THAT THE DIRECTIONS FOR REPLACING THE LID AND <br /> TIGHTENING THE CLAMPS OR BOLT ARE CAREFULLY FOLLOWED TO <br /> AVOID PERSONAL INJURY OR DAMAGE TO THE EQUIPMENT. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.