Laserfiche WebLink
• �,'�R—�;�c°� APPLICATION — AGRICULTURAL EXCAVATI1 <br /> kSAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMEP <br /> � FILE NUMBER: PA- <br /> I complete discussion on slope requirements, see the San Joaquin County Development Title. <br /> • Hours of Operation: Excavation operations shall not be carried on during the hours from 9:00 P.M. through 5:00 a.m.,excepI <br /> Saving Time, whichever is legally in effect. (Note: The hours of operation may be modified by the review <br /> emergency. Said hours are based on either Pacific Standard Time or Pacific Dayl <br /> excavation's potential effect on surrounding land uses. <br /> authority based up. <br /> • Lighting: Any night lighting established on the property must be arranged and controlled so as not to illuminate public rights-c <br /> Air Pollution Control: All emissions are subject to the rules and regulations of the San Joaquin Coun <br /> • Topsoil Replacement: During the excavation,the topsoil must be set aside. Upon completion of an County Air Pollution Control Di <br /> replaced and the site leveled in conformance with the Reclamation Plan. <br /> indicates the replacement of the topsoil will not enhance the agricultural suitability of the suitabili p excavation,the topsoil sh< <br /> removed from the site.) (Note: This requirement may be waived if a soils rep <br /> Property. In such cases, the topsoil rr <br /> Weed Control: Operations shall be in accordance with instructions from the Agricultural Commissioner to control the spread of <br /> noxious weeds. l <br /> nta <br /> • Health and Vector Control: The excavation must not cause health or sa � mi <br /> the breeding or increase of mosquitoes, rodents or other <br /> ry hazards and shall not create conditions which will <br /> • Reclamation: pests. <br /> The reclamation of each phase shall be completed in <br /> completion n: the extraction portion of that phase. conformance with the reclamation plan within two years of <br /> reclamation will be a part of thea completed as soon as feasible. The schedule f( <br /> (Note: Reclamation shall be <br /> the sequence in which individual areas are to be excavated and reclaimed, or on the sequence approval of the excavation. It will define each phase of the excavation. The <br /> carried out on each area of the excavation. In either case, the reclamation schedule shall clearly <br /> in each area duringq nce which various tions t ons crephases may be at <br /> each phase.) <br /> state the operations to be carri� <br /> • Annual Inspection: The applicant must pay a fee to the County to cover the cost of an annual inspection of the excavation to ass <br /> compliance with the provisions of the permit <br /> Performance Guarantee: A specific condition on performance guarantee is re <br /> with conditions of approval. The amount of the guarantee is and will be fully in force during w reclaiming the site shall . reviewed annually by the guarantee <br /> a required to ensure reclamation r the site and Gated C' <br /> the applicant under this Section must be found acceptable by County h the life of the e <br /> "San Joaquin Development Services Division. The permit- The estimated c <br /> q County and the De p Counsel. The financial)guarantee o e shall be made nancia guarantee aroposec <br /> Department of Conservation". The type of financial guarantee shall be one of the following; <br /> a) Surety bond, payable tc <br /> b) Irrevocable letters of credit, <br /> C) Trust fund. <br /> FADEVSVC\Planning Application Fnrm <br />