My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007191
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NORTH RIPON
>
19469
>
2600 - Land Use Program
>
PA-0800162
>
SU0007191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:56 AM
Creation date
9/8/2019 1:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007191
PE
2606
FACILITY_NAME
PA-0800162
STREET_NUMBER
19469
Direction
S
STREET_NAME
NORTH RIPON
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24502011 38
ENTERED_DATE
5/21/2008 12:00:00 AM
SITE_LOCATION
19469 S NORTH RIPON RD
RECEIVED_DATE
5/20/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\APPL.PDF \MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\CDD OK.PDF \MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pq��ki :y APPLICATION - AGRICULTURAL EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> • :.a• FILE NUMBER: PA- <br /> ... � ' ui rs 4��� 4���q'��ic,j�ti ��,]'��.F3j ��r•�k k�Y ''7following <br /> requirements must be met by any approved Agricultural Excavation: <br /> por a complete discussion on slope requirements,see the San Joaquin County Development Title. <br /> • Hours of Operation: Excavation operations shall not be carried on during the hours from 9:00 p.m. through 5:00 a.m., except during <br /> periods of declared national,state or local emergency. Said hours are based on either Pack Standard Time or Pacific Daylight <br /> Saving Time,whichever is legally in effect. (Note: The hours of operation may be modified by the review authority based upon the <br /> excavation's potential effect on surrounding land uses. <br /> • Lighting: Any night lighting established on the property must be arranged and controlled so as not to illuminate public rights-of-way or <br /> adjacent properties. <br /> • Air Pollution Control: All emissions are subject to the rules and regulations of the San Joaquin County Air Pollution Control District. <br /> • Topsoil Replacement: During the excavation,the topsoil must be set aside. Upon completion of an excavation,the topsoil shall be <br /> replaced and the site leveled in conformance with the Reclamation Plan. (Note: This requirement may be waived if a soils report <br /> indicates the replacement of the topsoil will not enhance the agricultural suitability of the property. In such cases,the topsoil may be <br /> removed from the site.) <br /> • Weed Control: Operations shall be in accordance with instructions from the Agricultural Commissioner to control the spread of <br /> noxious weeds. <br /> • Health and Vector Control: The excavation must not cause health or sanitary hazards and shall not create conditions which will cause <br /> the breeding or increase of mosquitoes, rodents or other pests. <br /> • Reclamation: The reclamation of each phase shall be completed in conformance with the reclamation plan within two years of <br /> completion of the extraction portion of that phase. (Note: Reclamation shall be completed as soon as feasible. The schedule for <br /> reclamation will be a part of the approval of the excavation. It will define each phase of the excavation. The phases may be based on <br /> the sequence in which individual areas are to be excavated and reclaimed,or on the sequence in which various operations are to be <br /> carried out on each area of the excavation. In either case, the reclamation schedule shall clearly state the operations to be carried out <br /> in each area during each phase.) <br /> • Annual Inspection: The applicant must pay a fee to the County to cover the cost of an annual inspection of the excavation to assure <br /> compliance with the provisions of the permit. <br /> • Performance Guarantee: A specific condition on performance guarantee is required to ensure reclamation of the site and compliance <br /> with conditions of approval. The amount of the guarantee is and will be fully in force during the life of the permit. The estimated cost <br /> of reclaiming the site shall be reviewed annually by the Development Services Division. The type of financial guarantee proposed by <br /> the applicant under this Section must be found acceptable by County Counsel. The financial guarantee shall be made payable to <br /> "San Joaquin County and the Department of Conservation". The type of financial guarantee shall be one of the following: <br /> a) Surety bond, <br /> b) Irrevocable letters of credit, <br /> C) Trust fund. <br /> F\DEVSVOPlanning Application Forms\ Page 5 of 13 <br /> Agrecultural Excavation doc.(Revised 8-10-05) <br />
The URL can be used to link to this page
Your browser does not support the video tag.