My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007191
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NORTH RIPON
>
19469
>
2600 - Land Use Program
>
PA-0800162
>
SU0007191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:56 AM
Creation date
9/8/2019 1:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007191
PE
2606
FACILITY_NAME
PA-0800162
STREET_NUMBER
19469
Direction
S
STREET_NAME
NORTH RIPON
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24502011 38
ENTERED_DATE
5/21/2008 12:00:00 AM
SITE_LOCATION
19469 S NORTH RIPON RD
RECEIVED_DATE
5/20/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\APPL.PDF \MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\CDD OK.PDF \MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. AESTHETICS: The surrounding area is a mixture of small and medium <br /> sized ranches with little or no housing on these properties. The area to <br /> be reclaimed will blend into the existing field towards N. Ripon Road. <br /> II. DESCRIPTION OF PROPOSED MINNING OPERATION: <br /> A. See Map <br /> B. PRODUCTION SCHEDULE: Removal of sand deposit to take one <br /> and a half years with a annual removal of 24,000 cubic yards. <br /> C. MINING PLAN: <br /> 1. The removal of the sand will be on a year round basis except for <br /> poor or bad winter conditions with the majority of the sand <br /> being removed during the spring to winter period. If permit is <br /> approved July 1, 2008 total reclamation should be completed by <br /> February 1, 2009 or sooner. <br /> 2. TOPSOIL: <br /> 1. The topsoil is to be removed from property and not replaced, <br /> the soils report shows that there is not much difference in the <br /> sandy topsoil to be removed and dirt beneath the topsoil. <br /> 2. There will be no stockpiling of the topsoil. The SANDY top <br /> Soil will be used. See soils analysis <br /> 3. There will be no stockpiling of topsoil as stated in item #2. <br /> 3. OVERBURDEN/WASTE/ORE: <br /> A. The operation is a open pit type mine. No overburden of any <br /> Type. <br /> Page two <br />
The URL can be used to link to this page
Your browser does not support the video tag.