Laserfiche WebLink
B. A rubber tired wheel loader will be used to load the trucks, a <br /> 3500 gallon water truck for dust control and a 14 yard <br /> Laser land leveling scraper to level field to final grade. <br /> C. No explosives to be used. <br /> D. There is no overburden on this project. <br /> E. The maximum depth at the deepest point to be 4.6 feet. <br /> F. There will be no benches or deep slopes on this property upon <br /> completion of reclamation. <br /> G. This project to be done in one phase with the first part being <br /> the removal of the some old almond trees and excavating at <br /> the same time. The eastern 4.5 acres that abuts N. Ripon Road <br /> not to be excavated for sand but will be leveled at the same <br /> time the excavation area to the west to be reclaimed and leveled <br /> 4. MINE WASTE: <br /> 1. Total acres to be permitted is 21 acres <br /> 2. Total acres to be disturbed is 16.5 acres <br /> 3. Total acres to be reclaimed is 21 acres (includes 4.5 acres east end) <br /> E. WATER REQUIREMENTS: <br /> 1. Daily consumption 3500 — 7000 gallon per day during summer <br /> period. Fall and spring 3500 gallons per day. No water usage <br /> during the winter time. <br /> 2. Water is obtained from a on site well/pump and also can be <br /> The South San Joaquin Irrigation District. <br /> page three <br />