Laserfiche WebLink
*4./ <br /> c. POST MINING TOPOGRAPY <br /> 1. See map <br /> 2. See map <br /> 3. This project will have only one slope and will slope west to east towards N. Ripon <br /> Road at one tenth per hundred feet. <br /> D. IMPOUNDMENTS: <br /> 1. There will be no impoundments needed for this leveling/excavation permit. <br /> E. DRAINAGE: The natural drainage of slope/fall will remain in the same direction as it is <br /> now running from the west end of the field to the east end of the field. There <br /> will be no water running off of this property. The ground is sandy. <br /> F. DISPOSITION OF OLD EQUIPMENT: <br /> No building of any type will be erected, and loader and water truck will be <br /> transported from site at completion of project. Nothing to be left behind. <br /> G. REVEGETATION: The property owner is a long time rancher and farmer and will use <br /> the recommends from the soils report. <br /> I. IN STREAM MINING: There is no in stream mining. <br /> J. FUTURE MINING: This ground is to revert back to farming upon completion of <br /> reclamation with no other excavating to be done on this field. <br /> K. PUBLIC SAFETY: This excavation to be on the back part or western part of <br /> this field and away from the paved county road and the public. <br /> Page S <br />