My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007191
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NORTH RIPON
>
19469
>
2600 - Land Use Program
>
PA-0800162
>
SU0007191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:56 AM
Creation date
9/8/2019 1:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007191
PE
2606
FACILITY_NAME
PA-0800162
STREET_NUMBER
19469
Direction
S
STREET_NAME
NORTH RIPON
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24502011 38
ENTERED_DATE
5/21/2008 12:00:00 AM
SITE_LOCATION
19469 S NORTH RIPON RD
RECEIVED_DATE
5/20/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\APPL.PDF \MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\CDD OK.PDF \MIGRATIONS\N\NORTH RIPON\19469\PA-0800162\SU0007191\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. CONTAMINANTS: <br /> 1. The only contaminant would be the diesel fuel to be used in the <br /> water truck and wheel loader. <br /> G. WASTE WATER: There will be no waste water for this project. <br /> H. ORE PROCESSING; <br /> 1. There will be no ore processing for this project. <br /> 2. At this time we are not contemplating any screening being done. <br /> 3. No screening to be done. <br /> III. DISCRIPTION OF PROPOSED RECLAMATION: <br /> A. Subsequent Use: <br /> 1. The proposed use for this project is agriculture. The planting of a <br /> new almond orchard. <br /> 2. Please see the legal owners signature on the permit application. <br /> B. Reclamation Schedule: <br /> 1. Upon the removal of all sand it will take one land leveling <br /> scraper less than one week to level and slope field to final grade. <br /> 2. See Maps. <br /> 3. By doing the reclamation this way only 16.5 acres will be <br /> distrubed and the rest of the ranch can continue crop production <br /> until the excavation has been completed. <br /> page four <br />
The URL can be used to link to this page
Your browser does not support the video tag.