Laserfiche WebLink
GEOLOGY AND SOILS <br /> 22. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD <br /> Emergency Preparedness Plan. <br /> Timing: Inclusion of a rote on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.8.3 (1)] <br /> 23. Geotechnical Investigation Recommendations: The applicant shall follow the recommendations of <br /> the Geotechnical Engineering Study, Neighborhood C, Parcel E Mountain House, California, <br /> prepared in February 22, 2018 by ENGEO Inc. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps, and the incorporation of all recommendations of the geotechnical <br /> engineering study into site preparation and construction of each dwelling prior to approval <br /> of building permits. [SP II Implementation Measure 6.8.3 (2); San Joaquin County <br /> Development Title, Chapter 9-905] <br /> HAZARDS <br /> 24. Hazardous Waste: Handling, use and storage of hazardous chemicals or materials including, but <br /> not limited to, asbestos shall be carried out in compliance with all applicable safety standards and <br /> coordinated County programs. Applicable standards shall be made part of the construction <br /> specifications for contractors. <br /> Timing: Inclusion of note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPII Implementation Measure 6.7 (1)] <br /> 25. Pre-Construction Safeguards. Prior to any construction, appropriate plans, operating procedures <br /> and safeguards shall be undertaken to insure safety in the area of fuel lines and pipelines, <br /> consistent with the MHCSD Emergency Preparedness Plan (see Emergency Pipelines Safety <br /> Plan). [SPII Implementation Measure 6.8.1 (1)] <br /> BIOLOGICAL RESOURCES <br /> 26. Participation in HCP: The Tentative Map shall comply with the San Joaquin County Multi-Species <br /> Habitat Conservation and Open Space Plan (SJCMSCP), including all required take avoidance and <br /> pre-construction survey requirements [SPII Implementation Measure 7.3.1 (1)] <br /> Timing: Prior to approval of Final Map. <br /> 27. Endangered Species Act: In carrying out the operations of the Tentative Map, the applicant shall <br /> take no action that violates the California Endangered Species Act or the Federal Endangered <br /> Species Act. Compliance with said laws shall be the sole responsibility of the applicant and the <br /> applicant agrees to indemnify, defend and hold the County harmless from and against any claim or <br /> action by affected State agencies, or affected Federal agencies or other third party, as to the <br /> project's compliance with said laws. [SPII Implementation Measure 7.3.1 (2)] <br /> Timing: Improvement plans prior to Final Maps and ongoing. <br /> San Joaquin County (PA-1800118)\(Shea MH LLC) <br /> Community Development Page 17 <br />